Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Blast Improvements at the EKATI Fox Pit

    By Dwayne D. Tannant

    The Fox Pit at EKATI Diamond Mine reached a depth of approximately 150 m as of September 2005. The pit is designed with 11 m wide benches excavated using a double benching technique leaving 30 m high

    May 1, 2006

  • CIM
    Impressed Current Cathodic Protection of Pipeline

    By H. Houali

    Corrosion is an electrochemical process that causes degradation and deterioration of various steel works (pipelines, drains, cisterns) whether they are buried, immersed, or not. Worldwide, we estimate

    Jan 1, 2005

  • CIM
    Carbon-in-Pulp and Carbon-in-Leach Adsorption Circuits -Optimization of Design Using the Carousel System

    By N. Morrison, E. J. Rogans, A. J. Macintosh, N. Schoeman

    "The design of carbon-in-pulp (CIP), and carbon-in-leach (CIL) adsorption circuits has essentially remained unchanged since the early days of the carbon process for gold recovery. For CIP circuit the

    Jan 1, 1998

  • CIM
    Determination of High Concentration Rare Earth Elements in Metallurgical and Geological Samples Using Inductively Coupled Plasma Mass Spectrometry

    By A. Dunnett, N. J. Turner, J. Koyanagi, M. Ji

    The analysis of rare earth element (REE) samples is a necessary part of the metallurgical process for rare-earth bearing ores, providing invaluable information during testing procedures. This requires

    Jan 1, 2014

  • CIM
    Enhanced Silver Recovery at Brunswick Mining and Smelting Corporation Limited (NPL)

    By R. S. Boorman, L. J. Surges

    "Ore reserves at Brunswick Mining and Smelting totalled 101(106) tonnes grading 97 grams tonne-1 silver at the end of 1981. Silver is recovered as a byproduct in the copper, lead and bulk concentrates

    Jan 1, 1983

  • CIM
    The Renard Diamondiferous Kimberlitic Bodies, Quebec

    By Tyson C. Birkett

    Initial indicator mineral sampling covering 425,000 square km of northern Quebec and subsequent follow-up of positive results convinced the Ashton ? SOQUEM joint venture to acquire mineral rights to 3

    May 1, 2003

  • CIM
    A mineralogical evaluation of the spiral circuit at the Mount Wright concentrator by image analysis

    By J. M. D. Wilson, W. Petruk, C. Coté

    "The behaviour of minerals in the Mount Wright spiral circuit was investigated to find methods of improving iron oxide mineral liberation and recovery. The feeds, concentrates and tailings from roughe

    Jan 1, 1990

  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - OCEAN RIDGES - Diffuse-flow Hydrothermal Field in an Oceanic Fracture Zone Setting, Northeast Pacific: Deposit Composition

    By James R. Hein, Jane Reid, Robert W. Embley, Se-Won Chang, Randolph A. Koski

    "Abstract - This is the first reported occurrence of an active hydrothermal field in an oceanic fracture zone setting. The hydrothermal field occurs in a pull-apart basin within the Blanco Fracture Zo

    Jan 1, 1999

  • CIM
    Aspects of Sustainability Following Closure of the Steep Rock Iron Mines, Ontario

    By Victor A. Sowa

    "Abstract - In 1938, a body of goethite and hematite was discovered beneath Steep Rock Lake near Atikokan, northwestern Ontario. This was at the time the largest and richest undeveloped iron ore body

    Jan 1, 2003

  • CIM
    An overview of R&D in narrow-vein mining at Université Laval

    By C. Bourgoin

    "The limited development and application of new technologies to narrow-vein mining is currently impeding progress in the industry to a point where productivity, working conditions and operating costs

    Jan 1, 1994

  • CIM
    ANCIENT VOLCANOGENIC MASSIVE SULFIDE DEPOSITS IN CHINA - Sedimentary Exhalative Massive Sulfide Deposits in the Proterozoic Langshan - Zhaertai Rift in ChinA

    By Xuehui Xia

    Abstract -There are a number of sedimentary exhalative massive sulfide (SEDEX) deposits in the Proterozoic Langshan-Zhaertai rift at the western segment of the northern margin of the North China platf

    Jan 1, 1999

  • CIM
    Integrating Work Index into Mine Planning at Large Scale Mining Operations

    By Jose A. Caceres

    Mine planning and mineral processing optimization are usually treated as two unconnected problems, especially at open pit and panel caving mines where the cut-off grade is practically the only variab

    May 1, 2004

  • CIM
    Rossland Mine

    By Geoffrey Gilbert

    Rossland is in the West Kootenay district; 5 miles north of the International boundary and 4 miles west of Columbia River at Trail. The first claim in the district was located in 1887; but there was l

    Jan 1, 1954

  • CIM
    Inco's SO2 - Air Cyanide Removal Process

    By R. Vergunst, E. A. Devuyst, G. Robbins

    "INTRODUCTIONThe Inca process for continuous cyanide removal from industrial wastewaters was patented in 1984 by G.J. Borbely, et.al. (1). The process requires SO2, air, lime and a copper catalyst. Bo

    Jan 1, 1989

  • CIM
    Young-Davidson Mine

    By C. C. Allen, H. H. North

    "The Young-Davidson mine is in the southeastern part of Powell township, in the district of Matachewan. It is 32 miles southwest of Kirkland Lake, 48 miles southeast of Timmins, and 25 miles by road N

    Jan 1, 1954

  • CIM
    The Influence of the Anode Inclination on the Hydrodynamics of the Hall-Heroult Cell

    By L. I. Kiss, S. Perron, D. Toulouse, S. Poncsák, A. Perron

    Bubbles play an important role in many industrial processes. In a Hall-Heroult cell, used for aluminum production, bubbles contribute to induce flow in the cell. The induced flow is important for the

    Jan 1, 2006

  • CIM
    Processes, Information Requirements and Challenges Associated With Corrective Maintenance in Relation to Indoor Air Problem Related Work Orders

    By Xue Yang

    Even though many approaches have been proposed for automated fault detection and diagnosis of Heating Ventilation and Air Conditioning (HVAC) systems, and advanced maintenance programs, such as preven

    Aug 1, 2013

  • CIM
    Characteristics of Coal Bumps by Microseismic Monitoring in Underground Coal Mining with Hard Roof and Coal Seams

    By Yi-xin Zhoa

    The characteristics of coal bumps are analyzed based on the microseismic data from No.8935 workface in Xinzhouyao coal mine, Datong Mining Group. The geology of this workface is characterized by the t

    Aug 1, 2013

  • CIM
    Large-scale treatment of a concentrated cyanide waste solution by acidification

    By P. A. Riveros, R. Molnar, F. J. Baša

    "An acidification circuit was installed and operated at the Agnico-Eagle Silver Division refinery in Cobalt, Ontario, for treating ~300 m3 of a concentrated cyanide waste solution with the purpose of

    Jan 1, 1998

  • CIM
    A Review of Cemented Rockfill Practices and Properties in Canadian Mines

    By Muhammad Zaka Emad

    Cemented rockfill (CRF) plays a vital role in pillar-less mining. Many factors are associated with optimum design of a CRF material. Factors like strength, placement method, mixing, curing time, water

    May 1, 2011