Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Improving Flotation Recovery of Oxide Copper Minerals

    By T. Bhambhani, O. Yavuzkan, D. R. Nagaraj

    "Cu ore bodies commonly contain oxide Cu at the surface, with sulfide Cu content increasing with depth. The recovery of oxide Cu minerals by flotation is a longstanding challenge in the minerals indus

    Jan 1, 2016

  • CIM
    Hydrodynamics Analysis of a 680 M3 Mechanical Agitated Flotation Cell Based on Numerical Simulation

    By Shen Zhengchang, Dong Ganguo, Chen Dong, Zhang Ming

    "It is advantageous to process low grade ores with large scale flotation cells. Large-scale flotation cells have been enhanced with effective volume scale-up. In this paper, the latest and largest flo

    Jan 1, 2016

  • CIM
    Selection of Copper Electrowinning Harvesting Methods and Impacts on Copper Product Quality

    By N. Aslin, R. Clark, G. Heferen

    The methods of harvesting copper from stainless steel mother plates has been investigated from fundamental and operational experience perspectives. At least five different harvesting techniques have

    Jan 1, 2014

  • CIM
    Canmore mining operations

    By T. Patching

    "COAL MINING at Canmore, Alberta, began in 1886 and continued there until July 1979. A comprehensive review of the Canmore operations is not available, but the following notes have been prepared to ac

    Jan 1, 1985

  • CIM
    Leach Residue Filtration Studies at the Hudbay Zinc Pressure Leach Plant

    By S. Shairp

    At the Hudbay zinc pressure leach plant, filtration and washing of the second stage leach slurry takes place on a vacuum belt filter prior to disposal to tailings. Due to periods of poor filterability

    Jan 1, 2014

  • CIM
    A theory of cutter roof failure and its application

    By A. Baydusa, K. Barron

    A theory for cutter roof failure in coal mines has been developed. It is shown that the key parameters influencing the likelihood of cutter roof failure are the rock strength, the vertical stress (dep

    Jan 1, 1999

  • CIM
    Simulation on Impacting-Induced Dynamic Strain Energy of the Coalrock Combination Considering Interface Effect

    By D. J. Xue

    Four kinds of coal-rock combination were subjected to three kinds of stress waves in the SHPB numerical simulation. The wave propagation and the changes of the strain energy in the coal-rock combinati

    Aug 1, 2013

  • CIM
    Removal of HVOF and other Plasma Sprayed Metallic Coatings Using Ultrasonically Produced Forced Pulsed Waterjets

    By B. Daniels, A. Tieu, W. Yan, B. Ren, M. Vijay

    "Plasma or thermal sprayed coatings are becoming more widely used in a wide range of industrial applications. The preference to use thermal sprayed coatings is mainly attributed to its superior wear,

    Jan 1, 2006

  • CIM
    Recent Progress of the “O-SR Process” Technology

    By I. Ueda, S. Ishikawa, T. Nagata

    “O-SR process” in which the S-Furnace of the Mitsubishi process is followed by existing reverberatory furnaces (RFs) and Peirce Smith (PS) converters has been operated since December 2007. The S-Furna

    Jan 1, 2019

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By J. Cayouette, . Blatter, P. Cousin

    The Laronde mill was commissioned in 1988 and has been treating the Laronde Perim ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accomm

    Jan 1, 2011

  • CIM
    On the Post-Peak Fluid-Driven Damage of Rock-Like Material by Controlling Hollow Cylindrical Circumferential Strain Associate with Nodestructive Techniqe of Acoustic Emission

    By L. H. Chen, Y. C. Chen, Leo Benyamin, W. C. Chen

    "To investigate the evolution of fluid-driven fracture of rock-like material subjected to borehole fluid pressure and its consequential damage with regard to post-peak stabilization, micro-seismic act

    Jan 1, 2015

  • CIM
    Use of Conditional Simulation to Assess Mesclassifcation of Ore and Waste in a Highly Discontinuous Gold/Copper Deposit

    By W. Hardtke, B. Perry

    Model reconciliation problems at the low-grade, high-nugget Phoenix gold-copper deposit led to an examination of the influence of production decisions on ore-waste classification. A conditional simula

    Jan 1, 2011

  • CIM
    Detailed Modeling of an HPGR/HRC for Prediction of Plant Scale Unit Performance

    By J. A. Herbst

    Professor Klaus Schönert and his students used fundamental physics to develop many of the principles required for the design and scale-up of "Gutt Bett Zerkleinern" devices such as the high pressure g

    Jan 1, 2012

  • CIM
    The Northern Gateway Pipeline: A Possible Corridor to Seed Renewable Energy in British Columbia, Canada

    By Mory Ghomshei

    As fossil fuels become depleted over the next century, it is imperative that Canada and other countries examine ways to transition to other sources of energy, particularly renewable resources. A cri

    Aug 1, 2013

  • CIM
    Spinodal Copper Alloy C72900 - A New High Strength Anti-Friction Alloy System

    By F. C. Grensing, W. R. Crib

    Copper-15 Nickel-8 Tin alloy is a relatively modern material, having been discovered in the 1970’s. It has complexities with casting, hot working and interdependent solid state phase transformations.

    Jan 1, 2010

  • CIM
    Corrosion Behavior of Sintered NdFeB Permanent Magnets

    By K. S. Raja, B. Pesic, S. Kshetri

    "We investigated the electrochemical corrosion behavior of commercial permanent magnetic material (NdFeB alloy) in 0.1 M NaH2PO4 solution (pH:4.75) containing 0 – 1000 ppm of chloride at room temperat

    Jan 1, 2012

  • CIM
    Geology, and Petroleum Possibilities of the Rimouski -Matapedia Region

    By J. Beland

    The Rimouski-Matapedia region is along the southwestern extension of the central Siluro-Devonian synclinorium of Gaspe Peninsula. As in Gaspe about 30,000 feet of Siluro-Devonian strata rest on a "bas

    Jan 1, 1962

  • CIM
    Hydrocyclone Classification Modeling for Gold Ore Grinding Circuit Simulation

    By M. R. Khalesi, S. Bellec, C. Bazin, D. Hodouin

    This paper proposes a classification model to predict the split coefficient of gold ore particles as a function of the particle size and gold content. The model is calibrated and validated using data

    Jan 1, 2011

  • CIM
    Thickening of Low Temperature Extraction Oil Sands Tailings Using CaO and CO2

    By Rick J. Chalaturnyk

    In Alberta, oil sands bitumen is utilized for synthetic crude oil production by surface mining, bitumen extraction followed by primary (coking) and secondary (catalytic hydrotreating) upgrading proces

    May 1, 2002

  • CIM
    Goldcorp Eleonore - The First Year of Mill Operation

    By S. Parent, J. -F. Lepage, S. Glover

    "Goldcorp – Eleonore’s 7 000 tonnes per day gold mill was started up in October 2014 and achieved commercial production in April 2015. During the first year, operation has faced challenges from grindi

    Jan 1, 2016