Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improving Flotation Recovery of Oxide Copper MineralsBy T. Bhambhani, O. Yavuzkan, D. R. Nagaraj
"Cu ore bodies commonly contain oxide Cu at the surface, with sulfide Cu content increasing with depth. The recovery of oxide Cu minerals by flotation is a longstanding challenge in the minerals indus
Jan 1, 2016
-
Hydrodynamics Analysis of a 680 M3 Mechanical Agitated Flotation Cell Based on Numerical SimulationBy Shen Zhengchang, Dong Ganguo, Chen Dong, Zhang Ming
"It is advantageous to process low grade ores with large scale flotation cells. Large-scale flotation cells have been enhanced with effective volume scale-up. In this paper, the latest and largest flo
Jan 1, 2016
-
Selection of Copper Electrowinning Harvesting Methods and Impacts on Copper Product QualityBy N. Aslin, R. Clark, G. Heferen
The methods of harvesting copper from stainless steel mother plates has been investigated from fundamental and operational experience perspectives. At least five different harvesting techniques have
Jan 1, 2014
-
Canmore mining operationsBy T. Patching
"COAL MINING at Canmore, Alberta, began in 1886 and continued there until July 1979. A comprehensive review of the Canmore operations is not available, but the following notes have been prepared to ac
Jan 1, 1985
-
Leach Residue Filtration Studies at the Hudbay Zinc Pressure Leach PlantBy S. Shairp
At the Hudbay zinc pressure leach plant, filtration and washing of the second stage leach slurry takes place on a vacuum belt filter prior to disposal to tailings. Due to periods of poor filterability
Jan 1, 2014
-
A theory of cutter roof failure and its applicationBy A. Baydusa, K. Barron
A theory for cutter roof failure in coal mines has been developed. It is shown that the key parameters influencing the likelihood of cutter roof failure are the rock strength, the vertical stress (dep
Jan 1, 1999
-
Simulation on Impacting-Induced Dynamic Strain Energy of the Coalrock Combination Considering Interface EffectBy D. J. Xue
Four kinds of coal-rock combination were subjected to three kinds of stress waves in the SHPB numerical simulation. The wave propagation and the changes of the strain energy in the coal-rock combinati
Aug 1, 2013
-
Removal of HVOF and other Plasma Sprayed Metallic Coatings Using Ultrasonically Produced Forced Pulsed WaterjetsBy B. Daniels, A. Tieu, W. Yan, B. Ren, M. Vijay
"Plasma or thermal sprayed coatings are becoming more widely used in a wide range of industrial applications. The preference to use thermal sprayed coatings is mainly attributed to its superior wear,
Jan 1, 2006
-
Recent Progress of the “O-SR Process” TechnologyBy I. Ueda, S. Ishikawa, T. Nagata
“O-SR process” in which the S-Furnace of the Mitsubishi process is followed by existing reverberatory furnaces (RFs) and Peirce Smith (PS) converters has been operated since December 2007. The S-Furna
Jan 1, 2019
-
Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and FutureBy J. Cayouette, . Blatter, P. Cousin
The Laronde mill was commissioned in 1988 and has been treating the Laronde Perim ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accomm
Jan 1, 2011
-
On the Post-Peak Fluid-Driven Damage of Rock-Like Material by Controlling Hollow Cylindrical Circumferential Strain Associate with Nodestructive Techniqe of Acoustic EmissionBy L. H. Chen, Y. C. Chen, Leo Benyamin, W. C. Chen
"To investigate the evolution of fluid-driven fracture of rock-like material subjected to borehole fluid pressure and its consequential damage with regard to post-peak stabilization, micro-seismic act
Jan 1, 2015
-
Use of Conditional Simulation to Assess Mesclassifcation of Ore and Waste in a Highly Discontinuous Gold/Copper DepositBy W. Hardtke, B. Perry
Model reconciliation problems at the low-grade, high-nugget Phoenix gold-copper deposit led to an examination of the influence of production decisions on ore-waste classification. A conditional simula
Jan 1, 2011
-
Detailed Modeling of an HPGR/HRC for Prediction of Plant Scale Unit PerformanceBy J. A. Herbst
Professor Klaus Schönert and his students used fundamental physics to develop many of the principles required for the design and scale-up of "Gutt Bett Zerkleinern" devices such as the high pressure g
Jan 1, 2012
-
The Northern Gateway Pipeline: A Possible Corridor to Seed Renewable Energy in British Columbia, CanadaBy Mory Ghomshei
As fossil fuels become depleted over the next century, it is imperative that Canada and other countries examine ways to transition to other sources of energy, particularly renewable resources. A cri
Aug 1, 2013
-
Spinodal Copper Alloy C72900 - A New High Strength Anti-Friction Alloy SystemBy F. C. Grensing, W. R. Crib
Copper-15 Nickel-8 Tin alloy is a relatively modern material, having been discovered in the 1970’s. It has complexities with casting, hot working and interdependent solid state phase transformations.
Jan 1, 2010
-
Corrosion Behavior of Sintered NdFeB Permanent MagnetsBy K. S. Raja, B. Pesic, S. Kshetri
"We investigated the electrochemical corrosion behavior of commercial permanent magnetic material (NdFeB alloy) in 0.1 M NaH2PO4 solution (pH:4.75) containing 0 – 1000 ppm of chloride at room temperat
Jan 1, 2012
-
Geology, and Petroleum Possibilities of the Rimouski -Matapedia RegionBy J. Beland
The Rimouski-Matapedia region is along the southwestern extension of the central Siluro-Devonian synclinorium of Gaspe Peninsula. As in Gaspe about 30,000 feet of Siluro-Devonian strata rest on a "bas
Jan 1, 1962
-
Hydrocyclone Classification Modeling for Gold Ore Grinding Circuit SimulationBy M. R. Khalesi, S. Bellec, C. Bazin, D. Hodouin
This paper proposes a classification model to predict the split coefficient of gold ore particles as a function of the particle size and gold content. The model is calibrated and validated using data
Jan 1, 2011
-
Thickening of Low Temperature Extraction Oil Sands Tailings Using CaO and CO2By Rick J. Chalaturnyk
In Alberta, oil sands bitumen is utilized for synthetic crude oil production by surface mining, bitumen extraction followed by primary (coking) and secondary (catalytic hydrotreating) upgrading proces
May 1, 2002
-
Goldcorp Eleonore - The First Year of Mill OperationBy S. Parent, J. -F. Lepage, S. Glover
"Goldcorp – Eleonore’s 7 000 tonnes per day gold mill was started up in October 2014 and achieved commercial production in April 2015. During the first year, operation has faced challenges from grindi
Jan 1, 2016