Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Kumtor Gold Mill Start Up and Start up Challenges

    By John Kazakoff, Andrew Mortimore

    "Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the

    Jan 1, 1999

  • CIM
    Design and Implementation of Modified Mo Addition to EAF at Uddeholm AB, Sweden

    By M. Nzotta, L. Teng, S. Seetharaman, A. Chychko

    The objective of the present work is to optimize the EAF practice towards Mo alloying with maximum retention of the alloying element in molten steel. During Mo additions, there were significant losses

    Jan 1, 2011

  • CIM
    New technology for hoist conveyance monitoring and analysis (ce4cfab2-0d27-4d96-82b0-9facfbf66b01)

    By M. J. Beus

    Many mines in Canada, the United States and South Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due to the excessive weight. It has been sugg

    Jan 1, 2002

  • CIM
    Continuous gas holdup estimation in a laboratory mechanical cell using Maxwell's model

    By L. Magne, M. Maldonado, R. Varela

    Real-time optimization of flotation circuits demands for accurate and reliable measurements to support the decision making process. The collection zone gas holdup is an important variable in this cont

    Jan 1, 2015

  • CIM
    Comparative tests of two operating procedures for the Turam electromagnetic prospecting system conducted at the McClean uranium deposits in northern Saskatchewan

    By K. Duckworth

    "Comparative tests of the conventional Turam survey configuration and an alternative configuration called the Tx-parallel configuration were conducted at the McClean uranium deposit in northern Saskat

    Jan 1, 1988

  • CIM
    Experiences from Implementation of Advanced Process Control Projects

    By E. Sharifi

    Advanced Process Control (APC) has been one of the most beneficial tools in the past decades available to minerals processing industry. Low capital cost together with significant improvements in proce

    Jan 1, 2014

  • CIM
    Geophysical Case Study of the Gallen Deposit, Québec, Canada

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "As part of a larger research program, a number of MEGATEM airborne electromagnetic (EM) test flights were flown over the Gallen massive sulfide deposit in northwest Québec. A particularity of this te

    Jan 1, 2007

  • CIM
    Refining Practice at Pamour Porcupine Mines Limited

    By R. D. Lindsay

    "Pamour Porcupine Mines, Limited is involved in the mining, milling and primary refining of various gold, gold - copper and refractory gold ores. Pamour operates five mines in the Porcupine Mining Dis

    Jan 1, 1986

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Goldstream Concentrator Design and Operation

    By Stuart McTavish

    "Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th

    Jan 1, 1985

  • CIM
    Study of slime coatings in flotation by electrophoretic mobility distribution measurement

    By Jacob Masliyah, Zhiang Zhou, Tshitende Kasongo, Jianjun Liu, Zhenghe Xu, Jeawon Choung

    "Slime coating is a recognized challenge in fine particle flotation, not only in decreasing recovery, but also in reducing the selectivity and hence froth quality. In this presentation, a novel method

    Jan 1, 2002

  • CIM
    Systematic and Integrative Ore Characterization of Massive Sulfide Deposits: An Example from Voisey’s Bay Ni-Cu-Co Ovoid Orebody, Labrador, Canada

    By P. J. Sylvester, D. H. C. Wilton, R. I. Wheeler, M. A. E. Huminicki, D. Evans-Lamswood

    "Systematic characterization of the mineralogy of massive sulfide ore deposits can provide valuable insights into ore genesis and metallurgical processing that would not be apparent otherwise. We desc

    Jan 1, 2012

  • CIM
    Adsorption Characteristics of Copper-Polyamine Chelates on Natural Bentonite and Peat

    By A. M. L. Cushing, S. Kelebek

    Presently, adsorption is one of the effective methods of removing toxic contaminants from waste waters. The contaminants from metal mining industrial operations include an effluent water containing va

    Jan 1, 2015

  • CIM
    Mining Operations and Slurry Pipelines Update and Future

    By R. A. Hill, J. D. Pitts

    "Long distance slurry pipeline systems have been successfully trans-porting steam coal, iron concentrates, copper concentrates and limestone for an aggregate of nearly 60 years and nearly three billio

    Jan 1, 1978

  • CIM
    Implementing Best Practices of Metal Accounting at the Strathcona Mill

    By Donald Leroux, Asim Tuzun, Simon Gariépy, Luc Lachance, Hayley Halsall-Whitney

    "The importance of coherent material balance results has long been recognized by mining and metallurgical companies. Although this is still true nowadays, various stakeholders are increasingly concern

    Jan 1, 2012

  • CIM
    Longwall Bottom-Belt Conveying in Thin Seams on Vancouver Island

    By E. O. T. Simpson

    "IntroductionAS COMPARED with coal mines in the United States, and even with some of those in eastern Canada, the coal mines of western Canada, generally speaking, :have made little progress toward me

    Jan 1, 1953

  • CIM
    Evaluation of liner capacity for blast damage mitigation

    By J. F. Archibald

    A research effort has been undertaken, under Workplace Safety and Insurance Board of Ontario (WSIB) sponsorship, to characterize the support capabilities of conventional and innovative spray-on lining

    Jan 1, 2004

  • CIM
    Effect of T4 and T6 Heat Treatments on Microstructural and Mechanical Properties of AX91-Re Mg Alloy

    By K. Meshinchi Asl

    In this study the effects of T4 and T6 heat treatments on microstructural characteristics of AZ91 alloy containing Rare Earth elements have been investigated. Formation of intermetallic Al1 1RE3 needl

    Jan 1, 2007

  • CIM
    Implementation of Stage Grinding at the Brunswick Mine Concentrator

    By J. Andrew Cornier, Mike Cooper

    "Upon successful completion of the AG/SAG Mill project (Cooper et al., 2001) the Brunswick Mine concentrator was configured with single line processing through the AG/SAG mill, followed by two paralle

    Jan 1, 2002

  • CIM
    Geology of the Palladium-rich Legris Lake Mafic-Ultramafic Complex, Western Wabigoon Subprovince, Northwestern Ontario

    By Kéiko H. Hattori, Neil T. Pettigrew

    "Abstract- The Legris Lake Complex is a northeast-trending, 7.3 km long by 3.5 km wide, maficultramafic intrusive complex located in the western Wabigoon Subprovince of the Archean Superior Province.

    Jan 1, 2001