Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Undergronnd ore handling and hoisting system at the Williams Mine

    By Henry Smith, Stu Brown

    "The Williams Mine is Canada's largest gold producer, with annual production of some 500 000 ounces of gold from two million tonnes of ore. Highly mechanized and automated underground mining prac

    Jan 1, 1991

  • CIM
    Kimberley Fatalities Incident- Technical Investigations and Findings

    Fatalities Incident Four people perished May 15 ? 17, 2006 ??Doug Erickson ??Bob Newcombe ??Kim Weitzel ??Shawn Currie Incident details available at: ??http://www.mediaroom.gov.bc.ca/sullivan_m

    May 1, 2008

  • CIM
    A New Era in Pressure Hydrometallurgy

    By Fathi Habashi

    A new era in pressure hydrometallurgy is marked when the roasting - leaching - electrowinning process in the zinc industry was replaced by direct pressure leaching of zinc concentrate. Since then, the

    Jan 1, 2014

  • CIM
    Paleo-geomorphology in the exploration for undiscovered sandstone-lead deposits, Salmon River Basin, Nova Scotia

    By P .. D. Vaillancourt, D. F. Sangster

    Several occurrences of disseminated galena, including a former producing mine, are found in Pennsylvanian fluviatile sandstone of the Salmon River Basin, Cape Breton Island, Nova Scotia. Detailed stud

    Jan 1, 1990

  • CIM
    Prediction and Estimation of Thermodynamic Quantities in Rare Earth Chloride Hydrates (RClx*NH2O)

    By G. J. Kipouros, W. Judge

    "The prevalent metal extraction processes for most reactive metals are fused salt electrolysis and metallothermic reduction. The feed material for both of these processes is the anhydrous chloride of

    Jan 1, 2012

  • CIM
    Developments in slurry pump technology

    By G. A. Davidson, P. G. Williams

    "New developments in centrifugal slurry pump technology are discussed in relation to their importance for improving pump operation and reliability.Experimental data obtained by measuring the velocity

    Jan 1, 1992

  • CIM
    Maximizing the Overall Effectiveness of Teleoperated Underground Loading and Haulage Equipment

    By Jacek Paraszczak

    Possibility to move human workers away from dangerous places ?enhanced safety and improved working environment; ? Increase of actual operational time: ? Less losses due to shift changes, regulatory

    May 1, 2010

  • CIM
    The Influence of both Cation and Anion Type on Leaching Efficiency of Lanthanides from Ion-Adsorption Ores

    By V. G. Papangelakis, G. A. Moldoveanu

    "One of the major commercially viable secondary sources of rare earths elements (REE) are the ion-adsorption ores, containing 0.05-0.3 wt% rare earth oxides physically adsorbed on the surface of clay

    Jan 1, 2016

  • CIM
    Rejection of Uranium from a Copper Gold Ore by Flotation

    By F. Ford, J. Dong

    "Laboratory and miniplant testwork was carried out to reject uranium from an Iron Oxide Copper Gold (IOCG) deposit that contains an average of 60-70 ppm uranium with high variability. The dominate cop

    Jan 1, 2016

  • CIM
    Development of a New Method for Aggregate Quality Control In Rock Quarries

    By H. Tudeshki

    A great amount of aggregate is utilized in civil engineering applications such as road construction, railway infrastructure, concrete production, etc. Igneous rocks are the preferred raw material due

    Aug 1, 2013

  • CIM
    Mine waste dumps constructed ill mountain valleys

    By Alan F. Stewart, Frederic B. Claridge, Robert S. Nichols

    "In recent years, an increasing number of mines in mountainous terrain have examined the possibility of placing mine waste rock into stream valleys. Pressure to utilize stream valleys as a primary loc

    Jan 1, 1986

  • CIM
    An integrated technique for vibration monitoring adjacent to a blast hole

    By P. Rocque, S. Talebi

    Although the measurement of blast vibration close to the blasthole is critical to the understanding of rock fragmentation mechanisms and blast damage in the rock masses, limited experience for such mo

    Jan 1, 1993

  • CIM
    Advances in technology for complex custom feed material treatment at Noranda

    By G. Kachaniwsky, M. Bédard

    "The Noranda Continuous Smelting Process at the Home smelter was commissioned in March 1973. The ability of the process to handle a wide variety of feed materials and a steady stream of technical inno

    Jan 1, 1991

  • CIM
    Lac Otelnuk Iron Project Nunavik, Québec

    By Frank Condon

    ?Location ?Background ?Drilling Program ?Mineral Resources ?Geology ?Economic Assessment ?Strategic Partner ?Located in Nunavik, Québec ?160 km northwest of Schefferville ?240 km south of K

    May 1, 2011

  • CIM
    The Impact of Copper Mine Tailings Dam on the Groundwater Quality

    By A. Torkian

    Process water from production of concentrates in Meydook copper sulfide mine is transferred to the 8.3 million m3 tailings dam and a water retention pond after initial thickening. Elevated concentrati

    Aug 1, 2013

  • CIM
    Info to Decisions - Application of Decision Networks in Mine Management Systems

    By Steven Chung

    Decision Network Modelling in a mining operation represents a complex process environment that is inherently more variable than a processing plant or factory. The uncertain availability of loading loc

    May 1, 2010

  • CIM
    New Rock Abrasivity Test Method by Rolling Disc

    By F. J. Macias, A. Bruland, F. E. Dahl

    "Tunnelling by use of Tunnel Boring Machine (TBM) is gaining a greater presence as a suitable excavation method. Disc cutter consumption has a strong influence on performance and cost when using TBMs

    Jan 1, 2015

  • CIM
    An evaluation of groundwater at the Gays River Mine, Halifax County; Nova Scotia

    By T. Lamb, T. Aston

    "The Gays River Mine is located within a complex hydrological regime and underground mining environment. Early in the mine history, the operation was' affected by an inability to control mine wat

    Jan 1, 1993

  • CIM
    Throwing the Switch - The Planning, Process and Challenges of a Ventilation System Changeover

    By Arsalan Talebzadeh

    Construction -Surface ?First two intake fans constructed in 2007; third fan added in 2008 to reduce resistance in the system. 450 HP fans. ?Excavation for exhaust fans started in 2008. ?In parallel

    Oct 1, 2010

  • CIM
    Ecological Engineering in a Mining Context: Past Progress-Future Promise

    By Margarete Kalin

    Mine Waste Management ?Reduction of Sulphideoxidation or inhibiting weathering of rocks Geologist - broken or ground rocks Hydrologist - sources of contaminants Mining engineer - waste sites C

    May 1, 2013