Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Case Study of Plant Trial on the Improvement of Gold Recovery of Preg-Robbing Ores by Surfactant

    By H. Cay, J. Zachwieja, T. Esplin, R. Ravenelle, T. Olsen-Tank

    Barrick Goldstrike mine utilizes a carbon-in-leach (CIL) circuit to simultaneously leach gold into solution with cyanide and adsorb the gold-cyanide complex onto activated carbon for further refinemen

    Jan 1, 2014

  • CIM
    Role of Technical Innovation on Production Delivery at the Polokwane Smelter

    By F. Stober, D. Wanblad, J. Ndlovu, L. R. Nelson, L. P. S. de Villiers

    The single six-in-line furnace of the Polokwane Smelter is the largest installed high-intensity furnace for platinum group metals (PGM) base metals sulphide smelting in the world. The furnace employs

    Jan 1, 2005

  • CIM
    Differential Thermal Expansion and its Influence on Metallurgical Furnaces

    By A. J. MacRae

    Metallurgical furnaces are made up of complex multi-component systems that must function either together or in parallel for safe, and reliable operation. Thermal expansion of single material component

    Jan 1, 2015

  • CIM
    The Gunnar uranium deposit

    By E. F. Evoy

    "The Gunnar uranium deposit was within metasedimentary rocks of the late Archaen Tazin Group. These rocks were intensely altered by albitization so that the immediate host to the ore consisted dominan

    Jan 1, 1986

  • CIM
    Financing From the Perspective of Mining Companies

    By Eric Low

    Raising capital by issuing debt or equity is necessary in almost every corporation. In the field of corporate finance, the raising of capital is a heavily-studied topic. However, some of what is studi

    May 1, 2011

  • CIM
    Simulator Features

    Train on Different Equipment - * Immersive?s interchangeable cabin controls technology - ?clip on & off? * Change Simulator from one machine to another in minutes * No technical expertise require

    May 1, 2003

  • CIM
    Guyana Goldfields Flagship Aurora Project – Road to Success

    By Jon Errey, Aleksandar Petrovic, Karl Haase

    "Developing a gold deposit of this magnitude in the Amazonian jungle of Guyana posed many challenges. This paper describes not only the process & logistical challenges arising from the remote mine sit

    Jan 1, 2016

  • CIM
    The lighting evolution - A bright future for safety, efficiency and control

    By Bill Charbonneau

    Lumen, lm The measurement unit of light emitted by a light source 60W incandescent840 lumens 32W T8 linear fluorescent3200 lumens 54W T5HO linear fluorescent5000 lumens 400W metal halide24,000 lu

    Oct 1, 2010

  • CIM
    Towards an Integrated Framework for Asset and Process Health Monitoring and Optimization on a Milling Circuit

    "In mining operations, it is widely accepted that strategies to drive operational goals must revolve around improving plant availability, reliability and process efficiency. In this paper, an integrat

    Jan 1, 2014

  • CIM
    Outotec’s Fully Automated Smelter 2020 – The Vision, the Status and the Future

    By Joey Hoang, Robert Johansson, Tapani Keronen, Mikael Jåfs, Jani Jansson, Mikko Korpi

    At the Copper 2016 conference in Kobe, Japan, Outotec introduced a vision for the year 2020, wherein smelting would make use of four digital cornerstones: intelligent instruments, advanced process con

    Jan 1, 2019

  • CIM
    The Rate of Gold Dissolution in Concentrated Cupric Chloride Solutions

    By R. von Bonsdorff

    Electrochemical and quartz crystal microbalance (QCM) methods were used to investigate the dissolution rate of gold in a solution similar to those utilized by the Outokumpu HydroCopper® process. The m

    Jan 1, 2007

  • CIM
    Les Mines Selbaie Story Concentrator development and operation

    By Ken Wood, Luc Duval

    "The development and operation of the milling circuits treating the different Selbaie orebodies are discussed in this paper. The project is reviewed from metallurgical evaluation through construction

    Jan 1, 1990

  • CIM
    Evaluation of Ventilation On Demand (VOD) in Sudbury Mines

    By G. Lyle

    Since its inception CEMI (Centre for Excellence in Mining Innovation) has focused on facilitating innovative solutions to the mining industry in six strategic research areas; GeoRisk, ConstructMine, V

    Oct 1, 2010

  • CIM
    Biomineral Processing of High Apatite Containing Low Grade Indian Uranium Ore

    By Abhilash

    Uranium is conventionally extracted using a process that employs strong acid (H2SO4) and an oxidant (MnO2) as leaching agents. This method often creates environmental problems, requires large amounts

    Aug 1, 2010

  • CIM
    The Effect of DMSA Addition on the Performance of Thiosulfate Leaching of Gold

    By S. Hume, J. Shepherd

    Meso-2,3-dimercaptosuccinic acid(DMSA) was studied as an additive for thiosulfate leaching of gold. DMSA was added to solutionscomposed of either sodium thiosulfate or calcium thiosulfate and the solu

    Jan 1, 2015

  • CIM
    Development of New Erbia-Doped Yttria Stabilized Zirconia Solid Solutions via Spark Plasma Sintering

    By L. Bichler, C. J. Verdon

    In this work, the effect of doping yttria stabilized zirconia (YSZ) with 5, 10 and 15 mol% erbium oxide (Er2O3, erbia) was investigated using spark plasma sintering (SPS) technique. Sintering was carr

    Jan 1, 2014

  • CIM
    Evidence for a Feeder Pipe and Associated Alteration at the Brunswick No. 12 Massive-Sulfide Deposit

    By Wayne D. Goodfellow, William M. Luff, Steven J. Juras

    Abstract-Brunswick No. 12 is a vent-proximal massive sulfide deposit that formed above a feeder pipe with associated hydrothermal alteration. Because of the replacement of bedded sulfides deposited ab

    Jan 1, 1992

  • CIM
    An alkaline roast-leach process for treatment of titaniferous magnetite for recovery of chromium, vanadium & aluminum

    By G. M. Ritcey, S. H. Lucas

    "On the north shore of the St. Lawrence River, in Quebec, are located orebodies of low-grade titaniferous magnetite. The Quebec Mining Exploration Company (SOQUEM), who have an interest in the deposit

    Jan 1, 1980

  • CIM
    The Key Lake Uranium-Nickel Deposits

    By R. Gatzweiler

    The Key Lake nickel-uranium deposits are situated within the Wollaston domain of the Churchill structural province. The host rocks of the two orebodies are of Aphebian and Helikian age. The orebodies

    Jan 1, 1979

  • CIM
    Formability Improvment for AZ31 Magnesium Alloy Rolled at Wide Range of Rolling Speed and Reductions COM 2014 - 53rd Annual Conference of Metallurgists

    By H. Utsunomiya, J. Su, K. S. Tamimi, S. Yue, M. Sanjari, L. Kestens, Hara, A. S. Kabir, R. Petrov

    Manufacturing of thin sheet is difficult in industries. Some approaches, such as small-draft multi-pass rolling, intermediate annealing, isothermal rolling and high-speed rolling were proposed to over

    Jan 1, 2014