Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    New bearing application for pinion gear drives on mine hoists

    By R. A. McIvor, R. Levac

    "The Stobie No. 7 shaft, 14 ft diameter, double- drum skip hoist, was installed at the INCO Limited Frood Stobie Complex in 1942. Figure 1 shows the hoist layout. The hoist was originally equipped wit

    Jan 1, 2001

  • CIM
    Marked Ball Wear Testing

    By G. D. West, J. D. Purdue

    "Marked Ball Wear Testing (MBWT) employs identified grinding balls which are placed in an operating mill for a period of time, retrieved from the mill, and then measured to determine the amount of wea

    Jan 1, 1991

  • CIM
    Using Gas Monitoring and Personnel/Vehicle Tracking to Maximize the Benefits of Ventilation-On-Demand in Underground Mining Operations

    By Tanveer Jahir

    With increasing energy costs and mounting government pressure to adopt low emission, green sources of energy, it has become imperative to develop long-term sustainable underground infrastructures that

    May 1, 2011

  • CIM
    The Economics of the Carbon in Pulp Treatment of Low Grade Flotation Tailings: A Pilot Study

    By R. H. O. Wagner

    "This paper describes the bench testing, pilot plant studies of alternative flowsheets, to determine the feasibility of gold recovery, by carbon in pulp extraction, in the Schumacher Mill gold flotati

    Jan 1, 1984

  • CIM
    Use of the IREDES Standard For Real-Time Information Exchange in Mining Process Optimization

    By Christoph Müller

    Information exchange for mine process optimization is essential. Today, modern mining equipment uses the IREDES standard to exchange production plans and reports for easy management and storage. To ga

    Oct 1, 2009

  • CIM
    Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process Support

    By J. Sliwinski, J. Oliveira

    "The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo

    Jan 1, 2013

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013

  • CIM
    Observed Detonation Pressures of Blasting Agents

    By Alan Bauer, Melvin A. Cook

    Measured detonation pressures of "prills and oil" (94/6 ammonium nitrate/fuel oil) and three of the new "slurry" blasting agents are presented and compared with computed, ideal detonation pressures an

    Jan 1, 1961

  • CIM
    THE SSW PROBE: A new High-Tech Tool to Raise Ore Grades by Reducing Dilution Within Metal Mines.

    By Pierre Gaucher

    It is possible to selectively mine an orebody by combining the use of the SSW probe with any bulk mining methods as well as narrow vein exploitations. In other words, thanks to the use of the SSW prob

    Oct 1, 2001

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • CIM
    Acidic Effluents, Their Production and Characteristics

    By C. C. Walden, A. Bruynesteyn

    "Chemical and biological aspects of the formation of acidic effluents from sulfide waste materials are discussed. Test procedures to determine the acid producing potential of waste materials, as well

    Jan 1, 1980

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    The Operating Range Method for Backfill Hydraulics

    By D. J. Hallbom

    This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l

    May 1, 2007

  • CIM
    Consolidated Central Cadillac Mine

    By Theo. Koulomzine

    "The property of Consolidated Central Cadillac Mines, Limited, consists of 1,103 acres formerly held by Central Cadillac Mines, Limited, and Wood Cadillac Mines, Limited. Both mines have been partly d

    Jan 1, 1954

  • CIM
    Mocca: A Grinding Circuit Control Application

    By C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher

    "MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con

    Jan 1, 1991

  • CIM
    A Plant-Wide Control System for Flotation Level Control

    By D. G. Hulbert, J. H. Schubert, R. G. D. Henning

    "Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever

    Jan 1, 1995

  • CIM
    Urban mining — Recycling gypsum waste in Vancouver

    By J. A. McCamley

    Gypsum scrap generated from wallboard manufacturing, construction and deconstruction activities in North America, Europe and Japan is a recognized environmental problem. Landfill disposal of this gyps

    Jan 1, 2004

  • CIM
    Environmental Relevance of the Leachate Potential for Dry Storage of Delayed Coke

    By Joseph L. Fournier

    Suncor Oil Sands employs delayed coking technology in converting bitumen into synthetic crude oil. Currently up to 10,000 m3 of delayed coke (coke) is produced per day as a byproduct of the upgrading

    May 1, 2011

  • CIM
    Advances in Centrifugal Gravity Concentration – Beyond Low Mass Yield

    By Ish Grewal

    "Batch centrifugal gravity concentrators, which produce very high ratios of concentration, have become common place for recovering free gold within milling circuits. Their effectiveness has proven to

    Jan 1, 2009