Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King WiresBy Lewis Martin
Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few
May 1, 2002
-
How to be a SurvivorBy W. G. Johnson
"As we move into 1983, Canada is not only in a deep recession, there are major changes taking place.International competition is growing fiercer.Major core industries such as automobile, steel, mining
Jan 1, 1983
-
The Paracatu Expansion Project III ? Building the Largest Gold Concentrator of the WorldBy Luis A. Tondo
The Paracatu Expansion Project III in Brazil was implemented between 2006 and 2008 to increase the existing capacity from 20 to 61 Million tons per year of gold ore treatment. This expansion led the B
May 1, 2009
-
Autogenous milling — Effects on flotation of Mt. Lyell Copper ore Broyage autogène — Effets sur la flottation du minerai de cuivre de Mt. LyellBy N. C. Clarke, T. Wu, M. le Page, K. J. Henley
In 1994, Gold Mines of Australia acquired the rights to the historic Mt. Lyell copper mine, and commenced a feasibility study into expanding production. The ore was shown in laboratory tests to be ame
Jan 1, 2002
-
Some Approaches in Improved Fine Particle Flotation and SeparationBy Mohamed Ourriban, Yongjun Peng, Qi Liu, Denis Cotnoir
"In the flotation of fine particles, there are two difficulties in general: low recovery of valuable minerals and high recovery of gangue minerals. The low recovery of fine valuable minerals is attrib
Jan 1, 2006
-
Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )By D. Ingram
"PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it
Jan 1, 1976
-
Emperical Design of Stopes for the Lower Rodeo OrebodyBy Denis Thibodeau
The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the
May 1, 2002
-
100 Years of Blowing Bubbles for ProfitBy Jan E. Nesset
It is just over 100 years since the practice of blowing small bubbles into a mixture of ground ore and water revolutionized the mining industry, resulting in uneconomic deposits becoming highlyprofita
Jan 1, 2009
-
“Energy Management Program”By K. H. B. Wenzl
"Since the autumn of 1973, the world's attention was captured by the startling revelation that conventional energy supplies were not inexhaustible but were in fact quickly dwindling with future shorta
Jan 1, 1978
-
Mill Operations - Lean and KeenBy P. R. Richardson
"Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,
Jan 1, 1988
-
Cut off Grade Optimizer Integrating Contaminant ConstraintsBy Sebastián H. Troncoso
Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block
Oct 1, 2009
-
Developments in at-Face/in-Pit Processing TechnologiesBy Martin Stoklossa
Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho
May 1, 2008
-
Mine Planning Guidelines for Developing Sustainable Closure Drainage SystemsBy Leslie F. Sawatsky
Failure of drainage works is one of the principal threats to the sustainability of mine closure facilities but the risk can largely be remedied by appropriate design of mine closure drainage facilitie
May 1, 2004
-
Accounting for Risks in Economic Evaluation of Gold Mining Projects in Ghana ? A Case StudyBy Peter A. Eshun
This paper studies two methods that account for risks associated with gold mining projects such as mineral risks and country risks. The first method is sensitivity analysis, which investigates the eff
May 1, 2004
-
Mill Project Development at El Limon, NicaraguaBy Steve Hubbard, Brad Marchant, Rolando Cuadra
"Triton Mining Corporation acquired the rights to Mina El Limon in Nicaragua in 1993 by international bid. The bid included the gold operations at Limon and an exploration concession of approximately
Jan 1, 1997
-
Utilizing titanium to successfully handle chloride process environmentsBy R. W. Schutz
"Titanium possesses an exceptional and wide-range resistance to chlorides and their compounds when compared to most corrosion-resistant engineering alloys (CRAs) used in the chemical process industry.
Jan 1, 2002
-
The Effect of Lump Ablation on Pressure Gradient in Oil Sand Hydrotransport PipelinesBy D. Wolfe, K. Reid, T. Nunn
"The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. In order to minimize front-end rejects, and to allow for high throug
Jan 1, 2014
-
Carbon Dioxide Use for pH Control at Greens Creek MillBy Tim Martin, Dave Tahija
"In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p
Jan 1, 2016
-
The design of baffles to reduce axial mixing in flotation columnsBy M. H. Moys, J. A. Engelbrecht
"Large-diameter flotation columns are subject to severe axial mixing which has reduced column recovery and has generally limited it to cleaner applications. It has been assumed that columns with diame
Jan 1, 1993
-
Automated Mine Scheduling: What is it and will it help me?By Fraser Rowe
This paper discusses the philosophies, strategies, goals and pitfalls in automating a mine schedule. The intention of the paper is to give an open and honest view of who could benefit from moving to a
Oct 1, 2009