Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Towards a Novel Process for the Epoxidation of Propene over Gold/Titania-Based CatalystsBy Aalbert Zwijnenburg
One of problems connected with the use of gold/titania-based catalyst systems is the low yield in propene oxide (up to 2 wt %). It is shown that the low propene oxide yield is due to product inhibitio
Oct 1, 2003
-
Enhancing Cobalt Recovery from Copper/Nickel Matte Producing SmeltersBy V. I. Lakshmanan
Process Research ORTECH Inc. (PRO), with its in-depth knowledge on cobalt behaviour in nickel matte smelters and its novel mixed chloride hydrometallurgical processing, is developing a hybrid process
Jan 1, 2019
-
Antimony Milling at Consolidated Durham Mines and Resources LimitedBy B. St. Pierre
"The alchemists' symbol for antimony is a diamond with a dot in the centre. The latin name ''stibium'' gives this mineral its chemical symbol ""Sb"" and the name to the principal ore containing antimo
Jan 1, 1977
-
Estimation Errors for Gold Inventory in Large Carbon-In-Leach TanksBy Jr. Blanchette, Claude Bazin, Paul Blatter
"Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the
Jan 1, 2011
-
Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication BackboneBy Christoph Mueller
Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi
May 1, 2006
-
The Nanisivik MillBy A. C. T. Bigg
"The mineral potential of the Nanisivik area was discovered as far back as 1910 when a prospector of the Geological Survey of Canada, on an expedition under Captain J. G.Bernier, recorded a deposit of
Jan 1, 1980
-
ERG Tailings Retreatment Project"INTRODUCTIONGold tailings retreatment plants have been operated for many years throughout the world. Several large tailings retreatment facilities have been operated profitably in South Africa since
Jan 1, 1989
-
Parameters for Cyclone SelectionBy Norman A. Jull
"Factors which affect the separation achieved in a hydrocyclone are discussed and illustrated with graphs of some mathematical relationships.Definitions of separation and sharpness include comment on
Jan 1, 1972
-
A review of binder materials used in stabilized backfillsBy J Petrolito
"To improve the economic and environmental performance of underground mining operations, it is common practice to return the metallurgical waste material underground as backfill. This is called hydrau
Jan 1, 2005
-
Effect of FE, MN, CU and Mg Additions on the Microstructure of Al-10.8 Wt% Si Near-Eutectic AlloyBy A. M. A. Mohamed, F. H. Samuel, S. Valtierra, H. W. Doty, A. M. Samuel
"The influence of Fe, Mn, Cu and Mg alloying additions, Sr modification and grain refinement on the microstructure of as-cast and solution heat-treated Al-10.8% Si alloys was investigated using optica
Jan 1, 2006
-
Regional Issues Working GroupBy Bill Almdal
Today?s presentation ? Role of the Regional Issues Working Group ? What does RIWG do? ? How can RIWG?s work benefit Stakeholders? ? Review of forecasts vs. reality ? How have past investment comp
May 1, 2002
-
Energy Initiatives Ontario OperationsOntario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co
May 1, 2007
-
Novel High Efficiency Gold Extraction Process Using NanotechnologyBy Adil Aledresse, Louis Mercier, Laxman Amaratunga
"The development of high capacity adsorbents with uniform porosity denoted, MP-HMS (Mercaptopropyl – Hexagonal Mesoporous Structure) using nanotechnology, and their ability to extract gold from soluti
Jan 1, 2008
-
Growth through Continuous Improvement - Heap Leach Processing and Gravity Expansion at Fort Knox Gold MineBy James L. Oleson, Hunter R. Propsom, Kevan J. R. Ford, Robert D. Henderson, Bob Musgrove
"Kinross’ Fort Knox Gold mine, near Fairbanks, Alaska has successfully implemented two major metallurgical continuous improvement projects resulting in growth of gold production and an extension of mi
Jan 1, 2011
-
SPOC Project Software and ManualBy R. F. Pilgrim
"This first chapter of the SPOC Manual 1s intended as a general introduction to all the other chapters in which the mineral process evaluation and optimization methodology is presented. This chapter a
Jan 1, 1986
-
Hydraulic Hoisting & Long Distance Pumping of CoalBy R. E. McElvain
"Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.
Jan 1, 1978
-
Energy Conservation at Falconbridge Nickel Mines LimitedBy D. M. Doyle
"In this paper I will summarized the Falconbridge Nickel Mines1) energy costs and consumption data by fuel, process, cost centre and estimate our future costs and consumption patterns 2) detail the di
Jan 1, 1978
-
Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining SustainabilityBy Zetti Gavelán
Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty
May 1, 2010
-
Brunswick Mine SAG Mill Liner Design and WearBy Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah
"An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent
Jan 1, 2003
-
Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mineBy D. Ouellet, G. Gagnon, B. Simser, V. Falmagne
The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli
Jan 1, 2004