Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Research of an Approach used to Monitor Rate of Lump Coal on Comprehensive Mechanised Coal FaceBy Guoqing Cao, Xinghong Wang, Fuqiang Liu, Rong Shen, Xiaoping Yuan
In this paper, an approach is proposed to monitor the rate of lump coal based on image processing. Using this method, we effectively improve rate of lump coal on comprehensive mechanised coal face.
Jan 1, 1998
-
The Application of Expert Computer Systems in Environmental ControlBy Wernick B. J
Recently, the Environmental Engineering Laboratory of the Chamber of Mines of South Africa Research Organization has made signifi- cant progress in the development of more accurate algorithms for a
Jan 1, 1988
-
Geochemical Prospecting in Papua-New Guinea - Case HistoriesThe highland region of Papua-New Guinea is relatively rugged terrain where stream gradients are steep. In areas where porphyry copper deposits outcrop the streams commonly expose primary sulphide m
Jan 1, 1973
-
Lead-zinc Ore Mining by Mount Isa Mines Ltd, Hilton Mine, Mount Isa, QldHilton Mine is located 20 km north of the city of Mount Isa and Isa Mine in far north west Queensland. The sealed road used by the 500 employees to commute from the city is part of the Barkly Highway
Jan 1, 1993
-
The Bureaucratic Merry-Go-RoundThe bureaucracy in Victoria has worked against exploration and mining development. There is no doubt that the new Mineral Resources development Act has simplified matters on the mining side of the sys
Jan 1, 1992
-
Crown Minerals - Where it is at, What it DoesMy topic for today is the Crown Minerals of the future. New work initiatives are underway and the organisational structure is being overhauled. These are not insignificant changes and in this paper br
Jan 1, 2003
-
Paste Fill Operations and Research at Cannington MineBy R Rankine
Backfilling with paste fill has been an integral component of open stoping at Cannington since commencement of operations. Efficient paste filling is critical to successful mining of the Cannington or
Jan 1, 2005
-
Optimum Drill and BlastThe traditional concept of optimum drill and blast is that it is achieved when ore is produced at the lowest unit cost and, because of the complexities of most mining operations, represents a band w
Jan 1, 1998
-
A New Materials Handling Technique for Cemented Rockfill Distribution in VBM MiningBy Szymanski J
Although efforts towards producing a `total quality rockfill product' have allowed cemented rockfill costs to be reduced considerably, there is still tremendous potential for further cost reduc
Jan 1, 1995
-
Improving Fine Sulfide Mineral Recovery ù Plant Evaluation of a New TechnologyBy K Ellis, B Lumsden
A full-scale statistically-based on/off plant trial of a new flotation conditioning technology designed to improve fine mineral recovery was undertaken to determine whether the recovery of selected fi
Jan 1, 2005
-
Improved Process Control with On-Stream Analysis at Pasminco Metals - EZ, Hobbart RefineryThe development of reliable and accurate solution sampling systems plus on-line atomic absorption spectrophotometers and voltammetric analysers at Pasminco Metals - EZ's (PMEZ) zinc refinery at
Jan 1, 1993
-
Trends in Control System Equipment and Associated Data NetworksWith the continuing move towards digital signal based control and measurement, it is inevitable that such technology will be increasingly employed on remote sites. The benefits of increased metallurgi
Jan 1, 1985
-
Current and Potential Applications of Radiosotope X-Ray and Neutron Techniques of Analysis in the Mineral IndustryRadioisotope X-ray and neutron techniques of analysis can be used for the determination of a wide range of elements in minerals. The most important applications of these techniques to the mineral in
Jan 1, 1969
-
Understanding Mine Site Water and Salt Dynamics to Support Integrated Water Quality and Quantity ManagementBy S D. Golding, K Baublys, V Nanjappa, C J. Moran
Water reuse is becoming an integral component of the water management strategy on mine sites. This practise is being driven by corporate sustainability goals, community and societal pressures to demon
Jan 1, 2009
-
Environmental Planning for Mining of Cable Sands' Minninup Deposit, Western AustraliaBy Martinick WG
In July 1986, Cable Sands (W.A.) Pty Ltd commenced mining for mineral sands at Minninup, approximately 16 km south of Bunbury, Western Australia.The area being mined is from the heel of the foredune t
Jan 1, 1986
-
A Comprehensive Computer Model for Predicting Dynamic Subsidence for Longwall OperationsBy Peng SS
This paper presents a number of mathematical models for predicting the different phases of the complete surface subsidence process associated with underground longwall mining. A computer program de
Jan 1, 1992
-
Commissioning the Cannington Project ù Creating SuccessBy C Torrisi, J Andreatidis, M Duffy
BHPÆs Cannington process plant was commissioned in October 1997. The Cannington ore contains high grades of silver, lead and zinc but also contains high levels of fluorine which must be removed to pro
Jan 1, 2000
-
Assessment of Alternatives in Mineral Resource TechnologyThe earliest caveman, very much a minority group, in the face of great adversity and person- al peril, had to take his livelihood by stealth or force of arms - aided by some degree of reas- on and in
Jan 1, 1974
-
Electrolytic reduction of metal sulfides/oxides in molten salts for sustainable metal productionBy X Hu, J Björkvall, L Sundqvist Ökvist
The metal production industry is a significant contributor to global CO2 emissions due to the use of fossil fuels such as coal and coke. To mitigate these emissions and meet climate goals, innovative
Jun 19, 2024
-
Financial Model Analysing Tabular, Narrow-stope Long Hole Drilling in South AfricaIn-stope long hole drilling (face parallel drilling) is a new technology currently being applied to shallow dipping (
Jan 1, 2003