Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Chemical and Physical Variables Affecting Iron Ore Pellet PropertiesBy Carter NB
A statistically-designed experimental program has been used to study compositional and processing variables which influence the development of strength and reducibility of iron ore pellets. The eff
Jan 1, 1980
-
A Neutron Irradiation Method Suitable for On-Stream Analysis of Iron OreBy Borsaru M, Wylie AW
A neutron irradiation technique has been developed which is suitable for the determinat- ion of the iron and aluminium content of iron ore fines (-6 mm particle size) on a moving rubber conveyor be
Jan 1, 1978
-
Assessment of Ground Conditions for Pre-Stripping with Bucket Wheel ExcavatorBy Ellery B. I
Field investigations recently undertaken by Utah Development Company (U.D.C.) have been developed to allow the assessment of ground conditions relevant to the use of large bucket wheel excavators f
Jan 1, 1981
-
Accreted Terranes and Porphyry Copper Deposits in the Central AndesThe Central Andes in Peru, Chile, Bolivia, and Argentina, contain two contiguous terranes which were accreted i, Gondwanaland between the end of the Devonian and the end of the Triassic. These terran
Jan 1, 1995
-
Application of Synthetic Seismograms to Geophysical ProspectingSynthetic seismograms of reflectivity method and some field records available are studied to detect the amplitude anomalies at the interface of the gaothermal reservoir the gas and/or oil boundary, an
Jan 1, 1990
-
Flotation Cell Design û Experiences with the Jameson CellBy Manlapig E. V
ABSTRACT- I Results are given for a series of tests in which a 300 mm pilot-scale Jameson cell has been used in copper recleaner flotation, and for the flotation of a lead rougher feed. the results
Jan 1, 1991
-
GRUBE-M - A Planning and Information System for Underground Mining EquipmentBy Hunefeld R
In the field of mining engineering, design and planning are complex tasks, which require the knowledge of various engineering disciplines. GRUBE (Graphisch-RechnerUnterstiitzter BergwerksEntwurf) is
Jan 1, 1995
-
The impact of circulating loads on flotation circuit performanceBy McKee DJ
Many workers have observed an inverse relationship between final concentrate grade and valuable component recovery achieved by a flotation circuit, i.e. an increase in either grade or recovery may
Jan 1, 1986
-
Excavation Design and Mining Methods in the 1100 Orebody, Mount Isa Mine, AustraliaBy Sullivan BJK
The 1100 orebody is a massive copper sul- phide orebody which contains a major portion of the Isa Mine copper ore reserves of 130 million tonnes at 3.2%. The underground mining of a deposit as larg
Jan 1, 1978
-
Optimizing A Bore Core Evaluation Test ProgrammeThe drilling and evaluation of bore cores provides the best available statistical basis for characterizing a coal prospect. Important, long-term decisions by management frequently must be based on
Jan 1, 1977
-
Application of Whittle Four-D to Risk Management in Pit OptimisationNine case studies are presented to illustrate how risks can be, minimised or quantified during pit optimisation, utilising Whittle Four-D software. Each case study covers a specific problem that has
Jan 1, 1994
-
The Use of the Ring-Loaded Disc Test in the Quantification of Rock Comminution BehaviourBy S Blackburn, T Veasey
The physical and mechanical properties of rock can be measured by a variety of standard tests, and studies have shown that there should be a fundamental connection between breakage in comminution and
Jan 1, 2000
-
The Effect of Deep Bed and High Suctions on the Iron Ore Sintering ProcessThe effects of changes in sintering bed height, coke fuel, suction and basicity on sinter productivity, physical strength and mineralogy were determined. It was found that, for a given iron ore, th
Jan 1, 1975
-
Advanced Concepts in Large Slurry Storage TanksOne of the most frequently asked questions at the feasibility study stage of a project is, æhow big can one go?Æ This important question effects costing and efficiency of metallurgical equipment, the
Jan 1, 2006
-
Placer Gold-Measurement and RecoveryThe techniques used in evaluating gold placers and in recovering gold therefrom are briefly reviewed and critically assessed, relative to the estimated and actual recoveries from many operations.
Jan 1, 1976
-
Development of a Dynamic Blasting SimulationBlasting, particularly bench blasting, uses finite length cylinders of explosive close to two free faces. The rock to be blasted is usually intersected by a complex 3-D system of joints. To fully si
Jan 1, 1990
-
Developments in Ore Handling Methods at Mount Isa Mines LimitedBy Palmer C. G, Rowe P. G
Ore handling improvements at Mount Isa Mines Limited were necessary to keep abreast of technological advances in all phases of sublevel stoping practice.In the early 1930s an efficient ore handling sy
Jan 1, 1961
-
EastLink Tunnel - Permanent Concrete Lining and Waterproofing DesignBy E Taylor, F Lebbing
The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid
Jan 1, 2008
-
A Preliminary Crustal Model of Bougainville Papua New GuineaModels of the genesis of existing ore oodles and targetting of exploration for new mines are greatly enhanced by an-understanding of the plate tectonic environment existing at the time of mineral
Jan 1, 1987
-
Bauxitic Laterites of the South Western Part of Western AustraliaIn the Ora Banda area of the Eastern Gold- fields, the ultramafic rocks tend to be more deeply lateritized than most of the surrounding rock types, and lateritic nickel concentrations have been for
Jan 1, 1973