Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Using Data to Identify Risk to Improve Safety and Health PerformanceBy A Williamson
The New South Wales Department of Mineral Resources objective is to use data and information to undertake a detailed analysis of incidents and accidents to identify risks so that the predictable can b
Jan 1, 2003
-
Blasthole Cone Sampling Experiments for Iron Ore Flitch MiningBlasthole cone samples are used for grade control in most of the iron ore mines of the Pilbara of Western Australia. This method of sampling is straightforward when the target sampling interval matche
Mar 1, 2010
-
Risk assessment of iron mineral resources using conditional simulationsBy W Patton
Investment decisions in the mineral resources sector are made on the basis of an assessment of the economic potential for a mineral deposit. Given the supporting information for the location, scale, a
May 24, 2023
-
Radar-Based Surface Scanning with the World's First Fully Digital Beam Forming Technology Sensor Especially Developed for Mining Productivity and SafetyBy J Berg, M Hahn, R Winkel
Imaging sensor systems designed for the mining and minerals industry incorporate different physical measurement technologies that can be used to detect the machine environment, such as laser, ultrason
Sep 26, 2011
-
Aeromagnetometry and Aeroradiometry of Gabal El Kahfa Ring Complex, Eastern Desert, EgyptBy Rabie A. S, Fouad K. M, Ammar A. A
The existence of Gabal El Kahfa ring complex, located in the Eastern Desert of Egypt, has been ascertained from aeromagnetic and aeroradiometric survey data as well as by aerial photography. Two m
Jan 1, 1988
-
Real-time Through-belt Moisture Analysis for Iron OreBy A Harris, L Balzan
Accurate measurements of the moisture content of iron ore have increasing importance in modern mining operations. Knowledge of the moisture content allows process control actions to be carried out to
Jul 13, 2015
-
Characterising energy efficiency of particle sortingBy G R. Ballantyne, V Souto, K Bartram
Particle sorting allows partially liberated minerals to be separated prior to energy intensive fine grinding. Sensors select particles for separation and air, water or mechanical ejectors are used to
Aug 29, 2018
-
An Integrated Economics Model for In Situ Resource Utilisation in Support of a Mars ColonyBy C Tapia Cortez, A G. Dempster, R Fradet, S Saydam, T de Roche, R Shishko, J Coulton
Human ventures into space are entering a new phase in which missions formerly driven by government agencies are now being replaced by those led by commercial enterprises – in launch, satellite deploym
Nov 4, 2015
-
From paper to bytes – digital mapping implementationBy A Whaanga
The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr
Mar 22, 2022
-
Modelling and Design of Block Caving at Bingham CanyonOpen pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi
Jan 1, 2000
-
Critical risk management, good, but not good enoughBy D L. Head
Critical risk management (CRM) has become one of the latest safety buzz terms in mining. Everyone seems to be doing it, everyone seems to know about it, yet we are still having fatalities in our indus
May 5, 2022
-
A case study in managing a high consequence geotechnical risk in a Queensland coalmineBy K Young, M Martin, D Payne
This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor
Nov 29, 2022
-
Geomorphic design and landscape evolution modelling for best practice mine rehabilitationBy G R. Hancock, J F. Martín Duque
Post-mining landscapes are required to geomorphologically and ecologically integrate with their surrounds (Martín Duque et al., 2015). Designing and constructing an erosionally stable landform is
Jul 25, 2018
-
Field Trial of CSIRO VirtuoBlast Technology at the KCGM Super Pit - Part 1: Application to Pre- and Post-Blast MeasurementBy Y Wei, P Soole
This paper gives a brief description of VirtuoBlast technology ù a new, automated and highly interactive stereo vision technology which has been developed in CSIRO Exploration and Mining. VirtuoBlast
Jan 1, 1999
-
Using Reverse Circulation Drilling to Improve Sampling in a Complex Underground Gold Operation – An Innovative Approach to Underground Grade Control at the Sunrise Dam Mine, Western AustraliaBy F Clark, J T. Carswell
Ore definition for final stope planning is often a challenging prospect in underground (UG) gold mines which exhibit high geological and grade variability. Unlike the grade control (GC) scenario in an
Aug 18, 2014
-
Modern Mining GeologyBy G Fahey, S Rose
"Mining geology as a defined profession is only about 100 years old. The successful modern mine geologist needs to be a multidisciplinarian, but also needs to maintain a focus on the key outputs of th
Aug 18, 2014
-
Development of an acQuire Based Geotechnical Data Management SystemBy V Pere
A geotechnical data management system has been developed to manage drillhole and mapping data generated from in house and consultant administered field programs. This system comprises a data collectio
Aug 22, 2011
-
Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit MineBy N Johansson, D Johansson, A Beyglou, H Schunnesson
As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto
Aug 24, 2015
-
Listening to Local Voices – a systematic approach for understanding what a social licence to operate means for Rio Tinto in the PilbaraBy L Dawson, S Carr-Cornish, N Boughen, K Moffat, S Masterson
The risk and consequences of community rejection and loss of a social licence to operate is well articulated (Moffat et al 2018), however, the means for systematically managing this risk are less esta
Jul 25, 2018
-
Scaled depth of burial application to increase blast efficiency in PT. Indo Muro KencanaBy A Suwandhi, H Utama
PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (
Jun 22, 2022