Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Defining Residual Risk for Successful Mine Closure – a Geochemical PerspectiveBy T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham
Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a
Jun 28, 2016
-
Improving Drive Stability through Efficient Development Blasting Design and PracticesBy P Klaric
Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th
Aug 24, 2015
-
Continuous Carbon Concentration Measurement at Newmont Boddington GoldBy C McCamley
"The requisite for maintaining optimal carbon concentration levels in a carbon-in-leach (CIL) circuit is of paramount importance in the prevention of gold losses. The process’s ability to recover gold
Oct 10, 2016
-
"The Business Case for Early-stage Implementation of Geometallurgy– an Example from the Productora Cu-Mo-Au Deposit, Chile"By J L. Macdonald, G S. King
"The development of a predictive geometallurgical model is a multidisciplinary and iterative task that involves both discovery and integration aspects. In this paper, the authors discuss the concepts
Jun 15, 2016
-
Alternative Access, Mining and Hoisting for Underground DepositsIt is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam
Jan 1, 2000
-
The Determination of Dust Losses in Metallurgical Processes, As Practised at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.IN carrying out experiments to determine the amount of metal taken away by fume or fine dust the apparatus used requires to be strong and compact, as it is generaIIy necessary to work on a staging fix
Jan 1, 1922
-
Confirmation of Multiseam Extraction Rules for Black Rock Manganese Operations, Assmang, Northern Cape, South AfricaBy M K. C Roberts, M G. Magwaza, J W. L Hanekom, P Piper, R Lousteau
Due to the perceived potential to extract the second economic manganese seam at its Black Rock Operations in the Northern Cape Province, South Africa, Assmang commissioned an investigation with respec
Nov 5, 2014
-
On-Belt Analysis at Sepon Copper OperationBy T Arena
To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending
Aug 8, 2011
-
Maldon to Dombarton Rail Link – Design Development of the Avon TunnelBy A Bagis, T Baker
In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct
Sep 17, 2014
-
Dynamic grade control modelling processes at the Waihi Underground Gold MineBy A Whaanga, W Vigor-Brown
IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T
Mar 22, 2022
-
Towards the Elimination of Conventional Surface Slurried Tailings Storage FacilitiesBy D J. Williams
The approach to the disposal and storage of mine tailings is slowly evolving. Tailings disposal has been based on minimising short-term capital and operating costs, with rehabilitation costs discounte
Jul 27, 2015
-
Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume HighwayBy S J. Clarke, C S. Walker
The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de
Sep 17, 2014
-
Improving Blasting by a Team Approach at the Henty Gold MineBy R Wedmaier
Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û
Jan 1, 2001
-
Classification System Efficiency - A Comprehensive Closed-Circuit Grinding Optimisation MetricBy R E. McIvor, K M. Bartholomew
Classification system efficiency (CSE) is a simple, powerful metric that provides a comprehensive measure of classification system performance. CSE directly quantifies the amount of coarse solids in t
Sep 26, 2013
-
Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation DrillingBy M Goers, M Almond
"The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w
Aug 21, 2012
-
Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, SwedenBy M Svartsjaern, D Saiang and K Mäkitaavola
The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The
May 9, 2016
-
Improving dust management in gate road development – a computational fluid dynamics-virtual reality based training tool for mine workforceBy M Qiao, A Sugden, W Zong, J Hines, J Roberts, T Ren
Long-term exposure to respirable dust continues to present an occupational health and safety hazard to mine workers in underground mines. Workers who are exposed to mine dust can develop occupational
Apr 16, 2024
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?ProcessBy T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
An Investigation of the Corrosive Impact of Groundwater on Rock Bolts in Underground CoalminesBy P Craig, A Crosky, P C. Hagan, E Elias, B Hebblewhite, S Saydam, D Vandermaat
"Premature failure of rock bolts has been recorded at twelve underground coalmines over the past 15 years in Australia. Over the last four years, UNSW Australia has been conducting an Australian Resea
Nov 5, 2014
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017