    A System of Diluting Methane to Safe Levels

    By R Hughes

    "Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.

    Jun 1, 2012

  • AUSIMM
    Role of Environmental Ore Deposit Models in Resources Development

    By Y T. J Kwong

    With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource

    Aug 22, 2011

  • AUSIMM
    Reducing the Effect of Wind on Airblast Measurement During Blasting

    By K Henley

    One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic

    Aug 24, 2015

  • AUSIMM
    The underdog mechanical alternative for tailings dewatering: the screw press

    By S Whitton, W Wimmler, L Wimmler

    “Given the increasing scrutiny of the mining industry and its relatively poor record with regards to mine tailings management, increased requirements to minimise water usage (often accompanied by very

    Jul 1, 2021

  • AUSIMM
    Modelling Dust Plume Movement Resulting from Surface Blasting Operations

    By S Bhandari

    A model for predicting dust plume dispersion from blasting operations using the Eulerian mathematical algorithm has been developed. This model considers atmospheric stability, and wind velocity and di

    Nov 8, 2011

  • AUSIMM
    The Impact of Classification on the Energy Efficiency of Grinding Circuits - The Hidden Opportunity

    By W Valery, A Jankovic

    A growing demand within the minerals industry for sustainable development and the introduction of carbon taxes have resulted in a significant focus on improving the energy efficiency of comminution ci

    Oct 29, 2012

  • AUSIMM
    Miining Development, the Public Sector and The AusIMM - Issue and Future Directions

    The mining of Australia's rich and diverse mineral resources has been central to the development of the continent by "Europeans" over the past two hundred years. Mining has historically been en

    Jan 1, 1988

  • AUSIMM
    ACARP Belt Press Filter Design, Operation and Maintenance Handbook

    By D Eschebach, D Mathewson

    A belt press filter (BPF) handbook containing practical information for the reference of plant designers and operators has been created as part of Australian Coal Association Research Program project

    Jul 27, 2015

  • AUSIMM
    Perimeter Control Utilising Electronic Detonators at Mount Wright Mine

    By J Wall

    The use of electronic detonators in civil tunnelling applications, to reduce vibration in small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen

    Mar 21, 2011

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    The Approval of a Gold Mine in the Solomon Islands ù Environmental Planning Issues

    The Gold Ridge Mine is an open-cut gold mine in the Solomon Islands. The mine is owned and operated by Gold Ridge Mining Limited, a wholly owned subsidiary of Ross Mining NL. At the invitation of the

    Jan 1, 1999

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012

  • AUSIMM
    Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation Objectives

    By A A. Puhalovich

    The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca

    Jul 10, 2012

  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    The Measurement of Rock Stress for Tunnelling

    By I Gray

    While in some cases it is vitally important to measure the virgin stress in rock prior to tunnelling there are a number of cases where such stress measurement is really not required. The concept of ha

    Sep 17, 2014

  • AUSIMM
    Practical Considerations for Multimine Grade Reconciliation

    This paper discusses the implementation and potential limitations of the method for estimating sampling and analytical errors of multiple source mine output blended into a shipping product, described

    Mar 1, 2010

  • AUSIMM
    Improving Open Stope Productivity at Sunrise Dam

    By K Guilfoyle

    AngloGold Ashanti Australia Ltd operates an underground mine below a large open pit at the Sunrise Dam Gold Mine near Laverton in Western Australia. Operations are based on an extensive mineralised zo

    Nov 8, 2011

  • AUSIMM
    Alternative Underground Ore Transport Systems for the Jaguar Base Metal Deposit

    By W P. Darcey

    Jabiru Metals completed a feasibility study on the Jaguar Base Metal Project in July 2005. The study was based on conventional truck haulage via a decline. Conveyor haulage was considered but not in s

    Mar 21, 2011