Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improving Extraction Efficiency from Witwatersrand Gold Tailings using Flotation and Ultra-Fine Grinding of Concentrates

    By D Capstick, M B. Ebell

    This paper describes the test work, process design, commissioning and operation of a processing system at the Ergo gold operation that improves the extraction efficiency from gold tailings material. T

    Sep 26, 2013

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    Tunnel Design in an Alliance for Waterview Connection, New Zealand

    By D Maconochie, S Pradhan, M Reed

    The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi

    Sep 17, 2014

  • AUSIMM
    Fuzzy Model of a Multigrade Structure for Support of Decision-Making and Management in Mineral Processing

    By M J. Pejovic, I Miljanovic, A Milutinovic4, T Benovic, A Petrovski

    The paper presents a model of a multigrade monitoring-management structure for support to decision making and management in real and extended time in mineral processing (MP). The model was created as

    Sep 26, 2011

  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Quantification of HPGR energy efficiency effects on downstream grinding process

    By H Lieberwirth, M Pfeifer, F Heinicke

    HPGRs (high pressure grinding rolls) have been developed within the last decades for energy efficient processing of a wide variety of ores. Special interest has been raised by projects increasing the

    Aug 24, 2022

  • AUSIMM
    Managing Uncertainty on the Cut 8 Project

    By G M. Jones, J Rademan

    Debswana, owned by the Government of the Republic of Botswana (GRB) and De Beers in a 50:50 joint venture partnership, operates the Jwaneng diamond mine in Botswana - the most valuable diamond mine in

    May 24, 2012

  • AUSIMM
    Geometallurgical Modelling of the Dumont Deposit

    By M Sciortino, J Korczak, J Muinonen, A St-Jean

    The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir

    Sep 29, 2013

  • AUSIMM
    The coalmine roof rating – an update in its calculation and mechanistically why it works

    By M Colwell

    The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g

    Nov 29, 2022

  • AUSIMM
    Differences between the Engineering Cultures of Australia and Brazil

    By C Fountain

    Australian mining and engineering companies have increasingly been investing in the mining industry in Brazil. It is a country of enormous mineral and agricultural wealth, with a well-established mini

    Aug 8, 2011

  • AUSIMM
    Key Drivers of Energy and Cost Efficiency in Autogenous/Semi-Autogenous Grinding Circuits

    By G Lane, M Bueno

    In a recent publication (Bueno and Lane, 2011) the authors presented the analysis of a consolidated dataset composed by 137 autogenous/semi-autogenous grinding (AG/SAG) mill pilot trials. By comparing

    Oct 29, 2012

  • AUSIMM
    Training our New Starters – Between a Rock and a Hard Place

    By M Davis

    Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested

    Aug 22, 2011

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    Ventilation Considerations for the New Level Mine Project Access Tunnels

    By E Acu±a, B Prosser, R Alvarez, K Wallace

    This paper describes the ventilation analyses performed for the access tunnels at the New Level Mine project (NLMP) at CodelcoÆs El Teniente operation outside of Rancagua, Chile. This new mine is anti

    Jul 1, 2013

  • AUSIMM
    The Effect of Grinding Media on Copper and Gold Flotation in the Presence of Clay Minerals

    By R Wei, Y Peng, D Seaman

    This study addresses a widespread problem confronting the mining industry: the deleterious effect of clay minerals in flotation. This problem is seemingly exacerbated by the presence of iron contamina

    Sep 26, 2013

  • AUSIMM
    Mary Mac Hill - The Challenges and Strategies of Successful Open Cut Mining: A Complex Underground Gold Deposit Riddled with a Network of Complicated Voids

    By H Chalcraft, T D. Mullen

    Conditions encountered at a recently completed brownfields mining project provided valuable insight into, and development of, techniques for working in and around known underground mining voids in an

    Sep 18, 2012

  • AUSIMM
    A Large-Scale Unconfined Compressive Strength Test for Determination of Rock Mass Parameters in Tunnel Design

    By A Smith

    Rock masses usually exhibit scale dependent mechanical properties primarily due to presence of discontinuities and their inhomogeneous nature. One of the essential preconditions for selection of appro

    Mar 8, 2011

  • AUSIMM
    Sulfide Flotation at the Renison Tin Concentrator, Tasmania

    By Grano S. R, Kilgariff B

    The Renisun Tin concentrator treats an ore containing I's per cent till as cassiterite and 22 per cent sulphur in a range of sulphide minerals. predominantly pyrrhotite. The sulphide minerals a

    Jan 1, 1997

  • AUSIMM
    A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and Leading

    By J Nixon

    I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co

    Mar 21, 2011