Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Innovative Approach to Open Pit Edge Protection

    By N Redwood, N Fowkes, A Bassom, S Durkin

    "It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat

    Nov 15, 2016

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper Operations

    By G Chitumbura

    Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu

    Mar 21, 2011

  • AUSIMM
    Advancements in Condition Monitoring on Mill Drive Trains for Proactive Maintenance and Early Fault Detection Purposes

    By T Roesch, M Neurohr, S Stratton

    "Dwindling commodity prices are forcing today’s mining operations to increase output. Sometimes the solution is to upgrade the existing infrastructure; however, in most cases it has to be achieved wit

    Oct 10, 2016

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    Mine Water - Optimising for Site and Environment

    By P Thompson, B W. Atkinson

    Water treatment is not æcore businessÆ for mining companies.Just as mineral ores and coals are unique, each requiring detailed characterisation and pilot-testing to determine their optimum beneficiati

    Nov 26, 2013

  • AUSIMM
    Independent Decline Haulage at Kanowna Belle Gold Mines

    In May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w

    Jan 1, 2002

  • AUSIMM
    Dynamic Displacements from a Blast-triggered Seismic Event

    By D P. Blair

    Various analysis techniques are used to determine the nature of a large seismic event that was triggered by a mass blast in an underground mine. This event was recorded by surface accelerometer arrays

    Aug 24, 2015

  • AUSIMM
    Development of new performance prediction models for a raise boring machine based on indentation tests

    By C Balci, D Tumac, A Sheterpour-Mamaghani, E Dogan, A Kocbay, T Erdogan, A Gumus, H Copur, E Altintas

    Excavation of vertical and/or inclined shafts in the underground structures requiring careful design and planning. Raise Boring Machines (RBMs) are commonly used for excavation of shafts for different

    Nov 29, 2022

  • AUSIMM
    Roof characterisation for hazard planning at Oaky North mine using geophysical data

    By B Vorster, T Medhurst, A Huey

    Roof conditions at Oaky North Mine can be prone to stress related damage and/or time dependent degradation. The ability to identify these areas prior to mining has proved challenging using traditional

    Nov 29, 2022

  • AUSIMM
    Opportunities for Sustainable Development at Chinh Bac Mine Waste Dump in Vietnam

    By J B. Pateiro-Fernßndez, M Fuchsschwanz, G Deissmann, S Ahmad

    Quang Ninh province is the most significant coal producing region in the north of Vietnam. The Nui Beo Coal Company (NBCC) operates open pit mines in Quang Ninh province and the waste overburden produ

    Jan 1, 2009

  • AUSIMM
    Spectroelectrochemical Raman Studies of Flotation-Reagent-Surface Interaction

    By K M. Watling, F M, G K. Parker

    Surface enhanced Raman scattering (SERS) spectroscopy at surfaces under electrochemical control has been applied to elucidate the adsorption of thiol collectors. SERS spectroelectrochemical studies at

    Jan 1, 2005

  • AUSIMM
    The æSmoking GunÆ of Detailed Mine Closure Cost Over-Run - A Review Using Case Studies of the Real Costs Associated with the Demolition and Removal of Infrastructure in Mine Closure

    By A Hutton, C Dick, D Fletcher

    Mine and facility closure planning is a dynamic and rapidly evolving landscape. In this landscape, mining companies and industry consultants are generally good at estimating the associated earthworks

    Jul 10, 2012

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Now to the Future – A Path Toward the Future Mine

    By I Gipps

    Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t

    Nov 22, 2011

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023

  • AUSIMM
    Measurement? Assessment? The Real Challenge is Communication

    One of the earliest and continuing challenges in driving sustainable development in large scale resource industry projects is around the issue of assessment û how do you measure the sustainability of

    Jan 1, 2009

  • AUSIMM
    Geostatistical analyses of cone penetration testing data of a tailings storage facility in a semi‐arid setting

    By P Chapman, B Moosapoor

    The objective of this paper is to present the potential applications of geostatistical analyses in planning CPTu investigations, as well as interpolation of CPTu data. The paper presents a case study

    Jul 1, 2021

  • AUSIMM
    Specification and Selection of Hand-held Gas Monitors (Detectors) for Underground Mines

    By D J. Brake

    There are many sources of gas in underground mines including development and production blasting, strata gases, spontaneous combustion, diesel equipment, chemicals used for a wide range of functions,

    Aug 31, 2015