  • AUSIMM
    Properties and Reactivity of Coal Chars for COREX Process

    By T Kang, V Sahajwalla, L Lu

    During devolatilisation, physical behaviour of coals was investigated in horizontal electrically heated furnace with an inert gas atmosphere, and gasification rates of four coal chars and coke were me

    Jan 1, 2000

  • AUSIMM
    Practical measures of process efficiency and opportunity

    By G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson

    Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid

    Aug 24, 2022

  • AUSIMM
    Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to production

    By H Wright

    Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp

    Mar 29, 2023

  • AUSIMM
    Acknowledgements (1726cf02-b79d-499d-92a9-156ed4eeb534)

    By BLAKE DAWSON WALDRON

    I must acknowledge my strategic adviser, Mr Lance Grimstone, who contributed to the development of this paper, and collated the text and figures.

    Jan 1, 1994

  • AUSIMM
    Mechanised, wireless development charging – Orica’s and Epiroc’s Avatel™ charging solution

    By B Taylor

    Although the underground mining environment is arguably safer now than at any time in history, as underground mining operations across the globe increase in-depth, magnitude, and complexity, protectin

    Mar 29, 2023

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013

  • AUSIMM
    Analysis on crack distribution and evolution characteristics of gangue backfilled working face roof

    By X Y. Ma, X G. Tian, P F. Zhang, T B. Zhao, Z H. Li, Z Y. Fu

    This study analysed the fracture characteristics and movement process of goaf roofs under the condition of gangue backfilled mining, based on the engineering conditions of Tangshan Mine F5001 gangue b

    Nov 29, 2022

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • AUSIMM
    The Development of a Dustless Dry Gunite Pump System in Underground Coal Mining – A Case Study

    By A Golsby

    Gunite was invented in 1907 by Carl Akeley to repair a crumbling facade of the Field Columbian Museum in Chicago. The method used was to blow dry material out of a hose with compressed air and inject

    Aug 31, 2015

  • AUSIMM
    Thickening at Karara – The Role of Test Work and Innovative Design

    By G Hart

    As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’

    Jul 11, 2011

  • AUSIMM
    Conducting High Chrome Grinding Media Trials at NewcrestÆs Ridgeway Concentrator

    By C J. Greet, J Kinal, C Hitchen

    Following the successful completion of a marked ball test defining the potential wear benefits the high chrome alloys may offer against forged steel, as well as laboratory test work investigating chan

    Oct 29, 2012

  • AUSIMM
    Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating Philosophies

    By M S. Fenzel

    Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos

    Jul 27, 2015

  • AUSIMM
    Ore Dilution Versus Mine to Mill Optimisation at KCGM

    By M Spiteri, S Woth, J Caratti, K Henley

    Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation and downstream processing. Dilution of the orebody to some extent is the inevitable result, partic

    Jan 1, 2001

  • AUSIMM
    The Brukunga Pyrite Mine ù A Field Laboratory for Acid Rock Drainage Studies

    By R C. Cox

    The Brukunga pyrite mine was operated from 1955 to 1972 to supply feedstock for sulfuric acid production in the South Australian fertilizer industry. Iron sulfide ore, mined by Nairne Pyrite Ltd, was

    Jan 1, 2003

  • AUSIMM
    Flexigel™ – A Variable-density Solution

    By D R. Andrew, K T. Morrison, J F. Tiedgen

    Waste blasting in iron ore operations can pose a number of technical challenges, including blasting through variable geology and blasting soft ground in wet conditions. Blast patterns are designed to

    Jul 13, 2015

  • AUSIMM
    Recovery-by-size Kinetic Analysis to Determine Where Metallurgical Improvements Occur When Converting to High-chrome Grinding Media

    By C J. Greet, S Jacques

    In most instances, the application of high-chrome grinding media results in an increase in the recovery of the valuable mineral(s). The authors have published data from a number of plant-based case st

    Sep 1, 2014

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    The Stabilization of Arsenic by Its Incorporation Into Lead-Zinc Smelter Slag

    By Lawson F

    Arsenic-containing waste was dissolved into molten slags and the leaching behaviour of the quenched arsenic-doped slags (containing up to 2.3 wt per cent arsenic) was ascertained to evaluate the poten

    Jan 1, 1996

  • AUSIMM
    Advancing sustainability in pumping systems – a comprehensive methodology for calculating, monitoring and minimising power and water consumption

    By A Karrech, G M. Hassan, A Varghese, E Lessing, S Martins

    Pumps play a critical role in mining operations, and their energy consumption and environmental impact are significant. This paper addresses the need for a holistic approach to sustainable pump deploy

    Sep 1, 2024