Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Silverton and Talisker MineMy forebears migrated to South Australia in the 1830s, 1840s and 1850s. All of them were literate but, because they moved about South Australia looking for work, family papers have become scat- ter
Jan 1, 1987
-
Rehabilitation, Recommissioning and Upgrading of the Leinster Nickel ConcentratorBy Millett R
In January 1989, Western Mining Corporation (WMC) acquired the Perseverance and Rocky's Reward orebodies and associated infrastructure from the Agnew Mining Company (AMC). AMC had closed the o
Jan 1, 1991
-
In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit ClosureBy D J. Robinson, L L. Kuhar
"Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to
Nov 15, 2016
-
Conducting comprehensive evaluations of preconcentration optionsBy P Holtham, K Duffy, B, W Valery, E Tabosa, rade
Pre-concentration has potential to significantly improve Mineral Resource efficiency by removing gangue early in the process, before energy intensive and expensive comminution and fine processing. How
Nov 10, 2020
-
Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the DogBy J Jackson, D C. Curry, A C. Keith
Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a
Sep 29, 2013
-
Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin MineBy M S. Kizil, T OÆConnor
It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At
Jul 1, 2013
-
Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of CyanicidesBy B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon
Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The
Sep 26, 2013
-
Example of a Dynamic Flotation FrameworkFroth flotation is widely used for the separation of particulate materials in the world. It is a complex process whose operational behaviour in process plants is difficult to predict. A comprehensive
Jan 1, 2005
-
Case study of joint structure and the design and performance of open pit walls at the Kanmantoo copper mineBy B J. Hutchison, S Gannon, J Chambers, D Oko-oboh
The Kanmantoo copper mine is located in the Adelaide Hills area of South Australia and is owned and operated by Hillgrove Resources (HGO). The mine is a drill and blast, truck and shovel operation min
Sep 20, 2017
-
Application of High Efficient Fine Screen to Improve the Recovery of Tin ConcentrateBy W N. Qin, B Zhang, W Z. Huang, X S Mo
Mengzi Mining and Metallurgy Co, Ltd (MMMC) polymetallic ore contains recoverable amounts of tin, lead, zinc, pyrite and other valuable minerals. With the change in orebody, the run-of-mine (ROM) ore
Sep 1, 2014
-
Maximising Productivity through Big Data, Simulation and Predictive AnalyticsBy M T. Grigoleit, M S. Schneider
The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher
Jul 13, 2015
-
Functional Performance of Ball Milling Circuits – A Plant Metallurgist’s Tool for Process Characterisation and OptimisationBy O Arafat, K M. Bartholomew
A voracious consumer of energy and grinding media, the modern ball milling circuit has a huge direct cost impact on a mineral processing operation. Through optimisation, grinding also has the potentia
Sep 1, 2014
-
Groundwater modelling support for closure approvals at Ranger Uranium MineBy J Sigda, T Jones, D Staggs, J Ewing, C Cheng, J Pickens, S Paulka
Mine-derived solutes from Energy Resources of Australia’s (ERA’s) Ranger uranium mine have been closely monitored for decades. Ranger is surrounded by the Northern Territory’s Kakadu National Park and
Jul 1, 2021
-
A Simplified Creep Analysis for Low Strength Seams in Rock PillarsBy M Habte
This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a
Mar 8, 2011
-
Designer Tailings – An Integrated Model for Tailings ManagementBy T Baumgartl, T Huynh, K Tungpalan, E Wightman, M Edraki, M Tayebi-Khorami, L Huang, S Palaniandy, E Manlapig
With the increasing rate of tailing production worldwide there is a growing concern about the hazards of tailings storage facilities (TSF). Past and current mining, processing and waste disposal strat
Jul 16, 2014
-
Options for Concentrate Drying Technologies when Designing a Copper SmelterBy H Lehtonen, H Mansikkaviita
In primary copper smelters, the received copper concentrate and other materials contain a certain amount of moisture, ranging from six to 14 per cent. Moisture in wet concentrate has a negative effect
Jan 1, 2006
-
The future is electrifying – introduction of a battery electric loader to CSA MineBy M Ireland
Extensive use of diesel-powered mobile equipment in modern mines for materials handling, such as load-haul-dump machines, constitute a significant source of heat, exhaust gases and diesel particulate
Mar 29, 2023
-
Brecciation, Mineralisation and Alteration of the Kidston Gold DepositThe Kidston breccia pipe is situated approximately 280 km west northwest of Townsville, north Queensland. It is currently Australia's largest gold producer with production varying between 8,0
Jan 1, 1987
-
Stochastic Production Scheduling – Solution through Langrangian Relaxation with the Branch-and-cut AlgorithmBy S Chatterjee
The production scheduling of an open pit mine determines the optimal extraction sequencing that significantly impacts a mine’s life as well as net present value. The optimisation of production schedul
Nov 24, 2014
-
Consideration for Multiobjective Metaheuristic Optimisation of Large Iron Ore and Coal Supply Chains, from Resource to MarketBy J Balzary, A Mohais
Dynamic market and operating conditions, coupled with an environment in which multiple objectives and trade-offs are common, pose major challenges for planners and schedulers working in any mining ent
Nov 24, 2014