Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation Optimisation Studies of the Perilya Broken Hill Lead Circuit

    By B Kilgariff

    Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at

    Jan 1, 2005

  • AUSIMM
    Intersection traffic strategy of unmanned truck in open pit coalmines

    By B Y. Luan, Y Tian, W Zhou, X Lu, Q X. Cai

    The unmanned driving technology in open pit coalmines is an important technology that relies on innovation to drive the development of the open pit coal mining industry in China’s transformation of gr

    Sep 1, 2024

  • AUSIMM
    Low Cost Production of Sulphuric Acid by the Minproc/Fattinger Process

    By Sneyd R. J, Walton M. C

    In early 1987 Minproc acquired a license from the inventor to engineer and construct acid plants incorporating the Fattinger technology. The process offers a simple and reliable method of producing

    Jan 1, 1989

  • AUSIMM
    Drilling and Blasting Techniques in Shallow Manganese Ore Deposits at Groote Eylandt û Present Performance and Future Outlook

    By Barber J

    The manganese ore of Groote Eylandt is a shallow sedimentary deposit of Cretaceous age. There are a number of deposits which vary greatly in ore texture, density, percentage of matrix and thickness

    Jan 1, 1974

  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018

  • AUSIMM
    Positive influence of WHIMS concentrate on the sintering performance of Roy Hill fines

    By S Hapugoda, J R. Manuel, X Cao, B D. McDonald, N A. Ware, L Lu

    Roy Hill is a large iron ore mining, processing, railing and port operation in the Pilbara region of Western Australia. Since delivering its first shipments to customers in December 2015, Roy Hill has

    Nov 8, 2021

  • AUSIMM
    The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia

    By P K. Wong, D A. F Oliveira, F M. Azad

    In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv

    Sep 17, 2014

  • AUSIMM
    Sulfidisation of Ilmenite Concentrates Contaminated with Chrome Spinels – A New Approach to Impurity Separation

    By M I. Pownceby

    High temperature roasting studies on chrome-spinel contaminated ilmenite concentrates showed that sulfur, introduced through a sulfidising roast treatment, selectively reacted with the chromium in the

    Oct 5, 2011

  • AUSIMM
    Elrington Colliery

    By Hindmarsh G

    The colliery is owned by the BHP Collieries Proprietary Ltd., the principal shareholders being the Broken Hill Pty. Company Ltd. and Hebburn Limited.It is situated due west of Newcastle and 6 south-ea

    Jan 1, 1935

  • AUSIMM
    Sustainable Waste Rock Remediation and Revegetation - A Real-World Longitudinal Study Comparing ViroMine Technology to Standard Applications and Doing Nothing

    By D Blair, L Fergusson, G Barros

    "The purpose of this paper is to present the findings of a waste rock remediation program conducted at a gold mine in New South Wales (NSW) over a six-year period. The treatment of waste rock dumps in

    Jul 10, 2012

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)

    By Kuganathan K, Potvin Y

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee

    Jan 1, 1998

  • AUSIMM
    An investigative study on the interfacial behaviour of waste graphite resource with liquid iron

    By S Udayakumar, S Biswal, N Sarmadi, V Sahajwalla, F Pahlevani

    Recent times have witnessed a notable momentum in the interest surrounding technology dedicated to harnessing waste as valuable resources, prompted by the mounting challenges posed by waste accumulati

    Jun 19, 2024

  • AUSIMM
    Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operations

    By H Rossiter, A Maddever, J Market, P Jeanneau, A Virani

    It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai

    Nov 10, 2020

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Future Climate – Is Heat Stress a Real Risk for the Future and How Can We Better Manage It?

    By C Killip

    Working in Australia’s harsh climate can have a significant impact on the health, safety and productivity of our teams, but is our working environment expected to be more prone to heat stress in the f

    Nov 4, 2015

  • AUSIMM
    Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter Study

    By L Smith, R Beckie

    An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w

    Jan 1, 2003

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • AUSIMM
    Wetting and drying cycles as a means to determine the effect and consequences of tailings ageing

    By T Baumgartl, R Akesseh, M Edraki, B Usher, M Shaygan

    With the continuing demand for industrialisation and urbanisation, the rate of mining and processing lower grade ores will also increase, producing large quantities of waste. As extreme weather events

    Jul 25, 2018

  • AUSIMM
    Conditions and Design Considerations for Maximising Recoverable Gold in Roasting of Refractory Gold Ores

    By M G. Aylmore, L W. de Klerk

    Roasting of refractory gold ores has been a commercial process for many years. Improvements in design of fluidised bed roasting technologies and low capital and operating costs compared with other ref

    Sep 26, 2013

  • AUSIMM
    Iron Blast Furnace Combustion Reactions-Formation of Silicon Monoxide in the Raceway

    By Cripps-Clark CJ, Deague TK

    In order to study conditions under which SiO(g) may be formed in a blast furnace, equilibrium phase diagrams were constructed for the combustion of high and low ash cokes with oxygen-enriched blas

    Jan 1, 1980