Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dissolution of Copper, Arsenic, Antimony and Bismuth in Silicasaturated Iron Silicate SlagsBy Jimbo I, Ogawa O
A series of experiments was carried out to investigate the solubilities of copper, arsenic, antimony and bismuth in silica-saturated iron silicate slags under controlled oxygen partial pressures a
Jan 1, 1980
-
Geostatistical Texture Modelling in Enhancing Ore Reserve Estimation in Base Metal DepositsBy Dimitrakopoulos R
Ore textures in base metal deposits are an important factor in the liberation of the economic components of the ore, metal recovery and reagent consumption during beneficiation. Optimising the mine
Jan 1, 1997
-
Estimation and Exploitation in an Underground Narrow Vein Gold Operation - Nalunaq Mine, GreenlandBy O Dahl, I M. Platten, E J. Sides
Many narrow-vein gold deposits are characterised by a high to extreme nugget effect and the presence of coarse gold. They rank amongst the most difficult of deposits to produce an accurate and precise
Jan 1, 2006
-
Plant Practice at the New Celebration Gold MineBy Martins V, Dunne R
A re-evaluation of the Hampton Boulder prospect in the early eighties resulted in a decision to proceed with mine development in December 1985. A 500 000 tpa gold treatment plant was commissioned in D
Jan 1, 1992
-
Celestite Ore Upgrading - From Laboratory to MillBy Joussemet R, Fabre F
The paragenesis of the Escuzar Mine (Andalusia-Spain) comprises: ò major constituents: celestite and carbonated minerals (abundant calcite and less frequent strontianite). ò minor constituents: sulph
Jan 1, 1993
-
Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case StudyBy R Carreau
The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately
Jan 1, 2003
-
Metallurgical test work – between a rock and a hard placeBy K Fiedler, A Newell, P D. Munro
Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and
Aug 29, 2018
-
Thermodynamic Considerations for the Production of Cu-Be AlloysBy T Iwadachi, T Fujisawa an, G R. Alvear
A large amount of Be2C and BeO is formed during the Cu-Be alloy production process, because beryllium is a highly reactive element. Carbide and oxide formation impairs the production yield and the qua
Jan 1, 2000
-
Utilising Statistics and Geostatistics to Validate, Characterise and Improve Geological Domaining ù A Case Study From BHP BillitonÆs Yandi Channel Iron DepositBHP BillitonÆs Yandi channel iron deposit has a large resource of approximately 1.3 billion tonnes. This is a bulk mining operation with a high degree of selectivity not being practical. In contrast t
Jan 1, 2005
-
Petroleum's Contribution to the Economic Progress of AustraliaAny Australian who knows of the poverty of the early settlers in the first few years following the arrival of Captain Arthur Phillip with his "first fleet" at Botany Bay must feel proud of the progres
Jan 1, 1962
-
Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case StudyBy D Blair, T Scutts, L Fergusson
This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh
Jul 16, 2014
-
Tectonic Setting for the Emplacement of Granitoid Rocks in BurmaThe granitoid rocks in Burma can be subdivided into three main belts viz. (1) Eastern Granitoid Belt, (2) W-Sn related, Central Granitoid Belt and (3) Porphyry Cu (Au)-related, Western Granitoid Be
Jan 1, 1987
-
Blast Engineering ù An Explosive CareerThis presentation is a 20 minute snippet of my professional career, and my progression in the mining industry, from a lazy uni student to an up-and-coming blast engineer in the middle of a mining boom
Jan 1, 2006
-
Tunnel Boring in the Mount Lyell MineThe Channel Tunnel is an outstanding example of an undersea tunnel and its design illustrates most of the unique features of this type of tunnel. The marine site investigation was partic- ularly vuln
Jan 1, 1976
-
An Analysis of the Resistance and Airflow Characteristics of Mine ShaftsDuring the 1950's there was a flurry of activity on the design of main ventilation shafts for mines. More recently, a new ana- lysis was commissioned in relation to the multi-shaft, nuclear wa
Jan 1, 1988
-
Fundamental Limits for Recycling - Formulating Environmental Legislation on the Basis of First PrinciplesBy O Ignatenko, A van Schaik
Environmental legislation for the process and manufacturing industries is frequently formulated without considering the fundamental limits of physics, chemistry and thermodynamics within process techn
Jan 1, 2006
-
The Argentine Pyroclastic LoesBy Pati±o A
The Argentine pyroclastic loess arevulcanogenic deposits, which have their sources in the circumnpacific rim. The object of this work is to realize a de-tailed mineralogical characterization of this s
Jan 1, 1990
-
Recovery of Gold from Acidic Solutions of Thiourea by Adsorption on Activated CarbonBy Oliveira JF
Thiourea is an alternative reagent for cyanide in gold leaching. The recovery of gold from acidic thiourea solutions by adsorption on activated carbon is based on methods similar to those applied fo
Jan 1, 1993
-
Developing Resilient Water Monitoring Programs in Changing Climate ConditionsBy A D. Price, W J. Germs, O Patterson, T R. Weaver
"Understanding controls on groundwater and surface water flow and quality at mine sites throughout all mine stages is critical to effectively manage environmental impacts over the entire mine life. Mo
Nov 26, 2013
-
Water Control in Exhaust Ventilation Raises and Associated Fan WorksThe Olympic Dam Mine is a large, mechanised, underground operation currently producing 2.2 million tonnes-per-year of copper/uranium/gold ore. The mine is accessed via one shaft and one service declin
Jan 1, 1992