Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Rotary Multi-Plate Valve as an Integrated Control System of a Longwall Roof Support

    An automatic control system of a longwall roof support is dis-cussed. Hydraulic automatic control systems for longwall roof support have not met all requirements for such systems. Utilization of stand

    Jan 1, 1985

  • AUSIMM
    Computer Aided Design and Analysis of Sapan Dalam Open Pit Mine

    By Milawarma E, Cusack C

    The Sapan Dalam coal deposit of Indonesia consists of ten steeply dipping seams with thicknesses varying between 0.1 and 3.5 m and split by shale, clay, silt and sandstone. The area contains four fa

    Jan 1, 1995

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality Management

    By F I. Cox, D Peeler, T Bodisco

    "Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in

    Mar 24, 2014

  • AUSIMM
    The Effect of Downhole Survey Uncertainty on Modelled Volume

    Downhole survey uncertainties observed at various De Beers operations prompted an investigation into their possible effect on deposit shape and volume. An accurately surveyed artificial æboreholeÆ was

    Jan 1, 2009

  • AUSIMM
    æDryÆ Granulation of Slags for Producing Cement Binder

    By B, T Norgate, S Sanetsis, R Davidson

    Global cement production accounts for about five per cent of man-made CO2 emissions (WBCSD, 2002). Such operating practices will increasingly be considered unsustainable, unless significant reductions

    Jan 1, 2004

  • AUSIMM
    The Company Perspective on Valuation Methods for Exploration Properties

    By Bucknell WR, Clarke DE

    The paper provides a company's view of the relative merits of various valuation methods and outlines the basic approach it takes to the valuation of an exploration property. The negotiating pr

    Jan 1, 1994

  • AUSIMM
    Mine Development Optimisation – An Evolutionary Process

    By J Kovacs

    Underground development drill and blast practices have generally remained unchanged for decades. Historically, development optimisation has focused mainly on the application of perimeter control produ

    Mar 24, 2014

  • AUSIMM
    Resource Estimation for the Aurukun Bauxite Deposit

    By C Grobler, M Recklies, G Jiang, I Taylor, M Morgan, G MacDonald, L Smith

    The resource estimation of lateritic deposits, such as Aurukun, presents specific issues related to the lateral changes in thickness and elevation of the various horizontal layers (or zones) within th

    Jan 1, 2009

  • AUSIMM
    Optimum Dig Lines for Open Pit Grade Control

    By I Treloar, T Elenbaas, E Isaaks

    Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t

    Aug 18, 2014

  • AUSIMM
    Optical Fibres and the Communications Revolution

    Industrial and telecommunications organizations around the world are now turning to optical fibres to satisfy their growing needs for data, voice and video communications and to solve transmission pro

    Jan 1, 1984

  • AUSIMM
    The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System

    By I Ross

    The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha

    Jan 1, 2005

  • AUSIMM
    Investigation on Sheelite Floatability by Particle Size Fraction

    Investigation on Sheelite Floatability by Particle Size Fraction

    Sep 13, 2010

  • AUSIMM
    Separating Particles by Horizontal Deflection in a Paramagnetic Fluid

    Separating Particles by Horizontal Deflection in a Paramagnetic Fluid This paper describes the horizontal deflection behavior of particles in paramagnetic fluids under a high-gradient superconducting

    Sep 13, 2010

  • AUSIMM
    Microtunnelling the Ocean Outfall Pipeline, Christchurch, New Zealand

    By R Fleming, G Jones

    An ocean outfall is currently under construction in Christchurch, New Zealand to transfer treated wastewater from the existing treatment ponds at the city wastewater treatment plant to diffusers locat

    Jan 1, 2008

  • AUSIMM
    Tin Metallurgy in Great Britain-1929

    By Elford H. S

    Australia has many potentially important tin deposits, particularly on the eastern shore of the continent and in Tasmania. A number of these have been worked on a meagre scale, while some of them, bec

    Jan 1, 1930

  • AUSIMM
    The Discovery and Early History of the Mt Leyshon Gold Deposit, North Queensland

    By J E. Lynch

    The Mt Leyshon gold deposit produced in excess of three million ounces of gold and considerable silver over a period of approximately 130 years. Most of this production occurred between 1987 and 2001.

    Jan 1, 2004

  • AUSIMM
    Analysis of Geotechnical and Support Parameters on Coalmine Entry Stability Using the Strength Reduction Method

    By G S. Esterhuizen, M M. Murphy, T S. Bajpayee

    The strength reduction method (SRM) has been implemented in the FLAC3D finite difference software and applied to coalmine entry support evaluations. The FLAC3D numerical models have been calibrated ag

    Nov 5, 2014

  • AUSIMM
    New Ways to Explore Through the Regolith in Western New South Wales

    By A McRae

    Much of western New South Wales is characterised by an extensive regolith formed during more than 60 million years of exposure, weathering and erosion. This cover includes intensely weathered in situ

    Jan 1, 2004

  • AUSIMM
    Evolution of In-Seam Drilling for Gas Drainage

    By F Hungerford

    "In-seam drilling has been undertaken for the past 30 years for gas drainage to reduce the risk ofoutburst and lower the concentrations of seam gas in the underground ventilation. The drillingpractice

    Jun 1, 2012