Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of a Semi-autogenous Grinding Mill through Trajectory and Power Modelling

    By P Toor

    Mill filling is an important operational parameter in a SAG mill circuit and by its control and optimisation it can produce significant improvements in production capacity and energy efficiency. Howev

    Sep 7, 2015

  • AUSIMM
    Paper No. 194. Geology of The Broken Hill Lode.

    By Voss Smith F, Matters C. W, Slee R. T, Coldham JC, Davies HW, Wallman H. H

    The Committee desires to thank the managers of the various mines along the line of lode for their hearty co-operation in its labours. It would also extend thanks to Messrs. J. O. Moulden, Howchin, Twe

    Jan 1, 1911

  • AUSIMM
    Speciation of Arsenic in an Anaerobic Treatment System at a Pb-Zn Smelter Site, Gold Roaster Products, Cu Smelter Stack Dust and Impacted Soil

    Mining and metallurgical processing of gold and base metal ores often results in solid wastes and effluents containing high concentrations of arsenic. In addition, arsenic can be released to the atmos

    Jan 1, 2008

  • AUSIMM
    Stream Sediment Geochemical Surveys: A Pilot Multielement Project Near Thames, Hauraki Goldfield, and Further Developments of the Regchem Database

    By J R. Goff, R Carver, D S. Sheppard

    The REGCHEM (Regional Exploration Geochemistry) stream sediment geochemistry database of open file mining company data, managed by GNS Science, was recently made accessible via the internet (http://ma

    Jan 1, 2006

  • AUSIMM
    The Impact of Politics, Economics and Local Legislation on Exploration and Mining in Pacrim Countries

    By M J. Bourassa

    In addition to the geologic risk of a particular project, the criteria that an international exploration company (æIECÆ) utilises when making an investment decision in a particular country should also

    Jan 1, 1999

  • AUSIMM
    The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDR

    By A Hoyle, P Walker, D Bennett

    The Phu Kham copper-gold operation located in Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited, based in Brisbane Australia, holds a 90 per cent

    Sep 7, 2015

  • AUSIMM
    Geostatistical Modelling of Hydraulic Fracturing Pressures at El Teniente Mine

    By P Landeros, D Benado, J Cornejo, A Pinochet, C Caviedes

    In 2005, El Teniente mine began preconditioning the primary rock mass by hydraulic fracturing (HF). The major perceived benefits of this process are a decrease in the magnitude of the expected maximum

    May 9, 2016

  • AUSIMM
    Styles of High-Sulphidation Gold, Silver and Copper Mineralisation in Porphyry and Epithermal Environments

    High-sulphidation (HS) gold, silver and/or copper deposits are generated in both the epithermal and the upper parts of the underlying porphyry environments over vertical intervals of up to 2 km. The H

    Jan 1, 1999

  • AUSIMM
    Optimising multivariate variographic analysis with information from multivariate process data modelling (partial least squares regression)

    By L O. Filippov, Q Dehaine

    Variographic analysis, a classical tool from the Theory of Sampling (TOS), can address practical situations with multiple variables; however, its application has very often been limited to one variabl

    May 9, 2017

  • AUSIMM
    Planning for Opencast Lignite Development in New Zealand - Lessons from the United Kingdom and Federal Republic of Germany

    Under the Town and Country Planning Act 1977 the Ministry of Works and Development has a responsibility for providing information to local and regional planning authorities on public works and matters

    Jan 1, 1981

  • AUSIMM
    A Mine Planning Model to Satisfy Long-Term Grade Targets

    By M Rimes

    This paper describes a technique to predict achievable head grades and likely variances from target grade for the Shovelanna Iron Ore Project, in the Pilbara region of Western Australia. The block mod

    Jan 1, 2007

  • AUSIMM
    A Petrographic and Oxygen Isotope Study of Banded Epithermal Veins from the Martha Hill Au-Ag Mine, Waihi, New Zealand

    By G B. Arehart, J L. Mauk

    Quartz veins from the Martha Hill epithermal gold-silver deposit, Waihi, commonly exhibit crustiform banded textures. Visual differences observed between bands are primarily the result of a 1 to 1500

    Jan 1, 1995

  • AUSIMM
    Implementation of a Surface-based Hydraulic Fracturing Program to Successfully Propagate a Large Cave through Hard, Competent Near-surface Rock Masses to Achieve Breakthrough

    By L Olivier, R J. Lowther, J L. Lett, I Brunton

    Hydraulic fracturing to precondition the orebody to enhance rock mass cavability is gaining acceptance in underground cave mining applications. Assisting cavability is becoming important as an increas

    May 9, 2016

  • AUSIMM
    Inpit Tailings Disposal, Marymia Gold Operation: Case History

    Inpit tailings disposal has been undertaken at a number of mining sites within Australia. This paper presents a brief history of the experience of inpit tailings disposal at the Marymia Gold Operation

    Jan 1, 1999

  • AUSIMM
    A Review of Gold Mineralisation and Processing in the Southwest Pacific Rim

    A number of mineral deposits occur in close proximity to the Pacific plate fronts. Among these deposits are gold-silver and the base metal sulphide deposits of copper, zinc and lead. Gold deposits tha

    Jan 1, 1999

  • AUSIMM
    Oxygen and Hydrogen Isotope Study of Veins in the Hishikari Epithermal Deposit, Japan: Origin of Ore-Forming Fluids

    Quartz, adularia and clay minerals from low-sulfidation epithermal veins at Hishikari were analyzed for their oxygen and hydrogen stable isotope compositions to establish the source of paleohydrotherm

    Jan 1, 2001

  • AUSIMM
    Design and Construction of the Yarra River Crossing

    By R Blair

    The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru

    Jan 1, 1999

  • AUSIMM
    Analysis and Modelling of the Fragmentation Process – Case Studies at El Teniente Mine

    By V Barrera, A Brzovic, M Gaete, L Burgos, E Arancibia

    Fragmentation is one of the most relevant parameters in the design and operation of a mine using the caving mining method. Fragmentation affects all subsequent operations, including extraction, commin

    May 9, 2016

  • AUSIMM
    Estimation of Regional Stress State and Young’s Modulus of Ground at Torigatayama Limestone Mine in Japan

    By D Fukuda, K Kaneko, R Kudo, J Kodama, Y Fujii, T Sasaki

    "Estimation of stress state as well as elastic modulus is important for the prediction of a rock slope deformation in an open pit mine since it can strongly influence the mining-induced deformation of

    Nov 5, 2014

  • AUSIMM
    Golden Cross Mine Rehabilitation Update - September 2000

    By A Goldstone, T Maton

    The Golden Cross Mine is located on the North Island of New Zealand, at the base of the Coromandel Peninsula, approximately 8 km northwest of Waihi. The project is operated as a Joint Venture with Coe

    Jan 1, 2000