Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    High Sulfidation Alteration at the Island Copper Porphyry Copper Deposit, Vancouver Island, Canada

    By S F. Simmons, J Fleming

    Alteration and mineralisation at the Island Copper deposit is related to the intrusion of Early Jurassic quartz feldspar porphyry dykes into surrounding comagmatic Bonanza volcanic rocks. The pyrophyi

    Jan 1, 1995

  • AUSIMM
    The Making and Evaluation of Directly Reduced Iron Pellets

    By J K. Wright

    In recent years the production of steel from directly reduced iron ore pellets has expanded rapidly. However, continued growth will depend on an adequate supply of suitable raw materials for the vario

    Jan 1, 1980

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Exploring the Breakage Environment in Mills with Discrete Element Methods

    Exploring the Breakage Environment in Mills with Discrete Element Methods

    Sep 13, 2010

  • AUSIMM
    Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the Result

    By J Belke

    Murrin Murrin Operations have not had a successful beginning. Numerous reliability and operability issues, many of which are the result of design decisions, have been addressed through mechanical and

    Jan 1, 2004

  • AUSIMM
    Tectonic Severance of Links between Placer Gold and its Sources, Southern New Zealand

    By D Craw, P Upton

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Otago Schist belt of southern New Zealand hosts widespread orogenic gold deposits. Eros

    Mar 18, 2015

  • AUSIMM
    Cyclone Process for Heavy Metals Decontamination of Sediments

    Cyclone Process for Heavy Metals Decontamination of Sediments

    Sep 13, 2010

  • AUSIMM
    The Control of Instantaneous Outbursts at Metropolitan Colliery, N.S.W.

    By Hindmarsh J. W, McCoy A. E R

    Instantaneous outbursts of coal and gas have occurred at various times in several working districts of Metropolitan Colliery, N.S.W.They have occurred in headings only, under both hand and mechanised

    Jan 1, 1964

  • AUSIMM
    Line and Plumb-Bob - A Review of Alluvial Mining at Five Mile Beach, Okarito, South Westland

    Although auriferous beach and fore-dune sands at Five Mile Beach south of Okarito township had been intensively mined by hand and primative mechanical methods drilling of the sandspit by the Gold Deve

    Jan 1, 1993

  • AUSIMM
    Establishing Metal Levels in the Ohinemuri River

    By W Donovan

    Concern exists about the potential release of metals from the proposed mining operation at Martha Hill to the Ohinemuri River. Speculation on possible impacts is fuelled by the dearth of published dat

    Jan 1, 1986

  • AUSIMM
    Current Extraction Technology for Free Milling Auriferous Ores

    By D M. Menne

    This paper is intended to give a general review of current gold extraction technology for free-milling or non-refractory auriferous ores. Fundamental process concepts and some of the differences betwe

    Jan 1, 1986

  • AUSIMM
    The Development of Sintering and Smelting Practice at Mount Isa Mines, Queensland

    By Blott S. F

    The smelting plant and equipment at Mount Isa, as originally designed and built, was described by J. M. Callow (1) *.F. A. Forward (2) described alterations and additions to the plant and discussed th

    Jan 1, 1939

  • AUSIMM
    Gold in Tailings - Mineralogical Characterisation and Metallurgical Implications

    By C A. Fleming

    Gold extraction is largely driven by mineralogical factors, which often cause gold losses to various tailings. Mineralogical factors affecting gold recovery include grain size and shape, surface coati

    Jan 1, 2007

  • AUSIMM
    Factors to be Considered in Assessing Investment Risk in the Mining Industry - A Comparison of New Zealand with Six Competitors

    Mining is a fundamental activity on which modern society and the world's economy are entirely dependent. Mining investors, large and small, invest on an international scale, frequently being acti

    Jan 1, 1993

  • AUSIMM
    Mineralisation of the Morobe Goldfield, Morobe Province, Papua New Guinea (888bc9dd-2413-4b17-98cf-f01418ee929d)

    By Mowat BA, Leach TM

    The Morobe Goldfield in Papua New Guinea has produced in excess of 120 tonnes of gold from predominantly alluvial sources. Hardrock gold has been mined historically at Wau (23t) and Edie Creek (40 an

    Jan 1, 1995

  • AUSIMM
    A Depositional Model for the Morley Coal Measures, Ohai Coalfield, Southland - Applications to Coal Exploration and Mining

    The Morley Coal Measures (Upper Cretaceous) at Ohai Coalfield were deposited in an intermontane basin alluvial environment of entirely terrestrial aspect. Within this regional setting, three distinct

    Jan 1, 1985

  • AUSIMM
    Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment

    By R R. Large

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in

    Mar 18, 2015

  • AUSIMM
    The Monowai Mine û A Mechanised Mini-Mine in a Forest Park

    A summary of a proposal to develop a 20 000 tpa underground gold operation in a Forest Park. The environmental constraints are severe and affected the mine development planning and choice of mining me

    Jan 1, 1986

  • AUSIMM
    Ore Treatment at Martha Current Operations and Future Directions

    The treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t

    Jan 1, 2001

  • AUSIMM
    Contaminated Water Management for the Golden Cross Mine

    By M J. Kindley

    The Golden Cross Gold Mine Project is now fully operational and into its second year of operation. Because of its location in the sensitive Coromandel Peninsula

    Jan 1, 1993