Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Volcanic Stratigraphy, Structure and Controls on Mineralisation, Golden Cross Mine, New ZealandBy P G. Rutherford, A W. McOnie
A volcanic sequence is described from the Golden Cross Mine, Waihi, New Zealand. The sequence includes seven lithostratigraphic units comprising flow and pyroclastic units of Coromandel Group andesite
Jan 1, 1995
-
Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New ZealandBy P E. H Gregg, D Horne, R B. Stewart, N Bolan
The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on sit
Jan 1, 1995
-
Validation and Simulation of Optimised Compressive CrushingValidation and Simulation of Optimised Compressive Crushing Ores and aggregates are used in countless applications all around in the society. The frequent and escalating usage of these natural resour
Sep 13, 2010
-
Synthesis of actinide chlorides for molten salt preparationBy S Serp, M Duchateau, P Chevreux
Molten salt reactor (MSR) is a promising advanced reactor system aiming to the transmutation of minor actinides such as americium in order to reduce the inventory of ultimate nuclear waste. The fuel i
Jun 19, 2024
-
A Review of Best Practice in Gravity Circuit Design and OperationBy A Bax, G Wardell-Johnson, A Giblett, W Staunton
This paper presents a number of key considerations for process development testwork as a reliable basis for the inclusion of gravity separation in gold recovery flowsheets. Operating data, experiences
Jul 15, 2013
-
CSIRO Research for the Iron Ore IndustryAustralia's iron ore industry is entering a challenging period with the development of new orebodies, the introduction of new products and the push for further downstream processing. In additio
Jan 1, 1999
-
Iron Ore Bedding & Blending at the Newcastle SteelworksExpansion of the B.H.P. Co. Ltd. mater ials handling facilities, at their Newcastle Steelworks, began in 1964 and continued until 1970. The present complex handles the annual iron ore requirement o
Jan 1, 1972
-
Geochemical Mining Impact and Possibilities of its ReductionBy V P. Elpatyevskaya, V S. Arzhanova
Main geochemical problems concerning the environment and mining industry interrelation are connected with the transformation of natural water chemistry by mining wastes. The investigation of many mine
Jan 1, 1995
-
Discovery, Geology and Structural Setting of the Nyidinghu Iron Ore Deposit, Hamersley Province, Western AustraliaBy D Kepert, M Absalom, N Nitschke, C Fowers
The discovery of the Nyidinghu Iron Ore Deposit totalling 2.46 Bt of resource continues FortescueÆs highly successful exploration record of discovering multi-billion tonne deposits under cover with li
Aug 12, 2013
-
Gold Ore Treatment at Macraes FlatMacraes Mining Company Limited operates a 2.1 million tonnes per annum gold processing plant at Macraes Flat, Otago. This uses a conventional CIL route to treat oxide ore, and a flotation, grind, CIL
Jan 1, 1992
-
Gold Financing and the Title to Gold: Gold Loans, Gold Coins and GoldcorpThe principal source of funding the working capital requirements of gold miners has traditionally been equity. However in the 1980s, with a substantial increase in activity in the exploration for, and
Jan 1, 1994
-
New online/atline splitter designs for laboratory automation – feasibility resultsBy A Hollweg, K H. Esbensen, M Lischka
Two new splitter designs for intercepting moving streams of matter are presented, the variable cross-stream splitter (vCSS) and the rotary stream splitter (RSS), which are intended for implementation
May 9, 2017
-
The New Updraught Sinter Plant at Mount Isa Mines LimitedAs part or a programme to raise lead smelter capacity from 65.000 to 140.000 tons bullion per annum. one new 1000 sq. ft. updraught area sintering machine replaced eight small downdraught machines.The
Jan 1, 1968
-
Polymetallic Mineralisation Associated with Cenozoic Volcanism in Northern Puna, ArgentinaBy M K. de Brodtkorb
Late Cenozoic ore deposits æPrecious and base metal-richÆ and æSn-Ag-polymetallicÆ ofNorthern Puna are associated either with Middle Miocene dacitic volcanic-dome complexes or with Upper Miocene dacit
Jan 1, 1995
-
Determination of the Equilibrium-State in Leaching Systems by the Iterative Equilibrium Constant MethodThe purpose of this work is to determine the equilibrium-state of the aqueous-solution which is produced by the leaching processes, including natural weathering of pyrite minerals. The latter can lead
Jan 1, 2008
-
Coal - Paper No. 8 Use Of Optimal Techniques To Minimise Moisture Retension In Fine Coal FiltrationBy Sergeant G. D, Norman J. R
The importance of reducing the moisture content of fine coal, the nature of the retained water and the means of its removal are discussed. A statistical technique, using a balanced block design, was
Jan 1, 1969
-
Martha Mine Tailings Storage Facilities ù How Do They Stack Up?By K M. Brodie, D I. K McLeod, J Ruddock
Environmental incidents involving mine tailings and waste rock inevitably become highly publicised and serve to damage the credibility of the entire industry. The recent serious incident involving a s
Jan 1, 2002
-
Development of an On-Site Mineralogy Solution for MetallurgistsBy D van der Wal, R Dobbe, K Moeller
"Ore mineralogy and texture are primary variables controlling mill recovery efficiency in flotation plants. However, tracking daily variations of key mineralogical characteristics such as species-by-s
Jul 15, 2013
-
Grasberg Block Cave Haulage Project – Design and Construction UpdateBy B Mead, N D. Pascoe
The Grasberg block cave rail haulage system will be located in the Grasberg mining district on the island of Papua, Indonesia at an elevation of almost 3000 m above sea level. It will transport 160 00
May 9, 2016
-
Observations on the Zinc-Lead Lode at Rosebery, TasmaniaThe zinc-lead lode at Rosebery, on the West coast of Tasmania, has a total length of over 4000 ft. It consists of five elongated lenses parallel to the foliation planes of the quartz sericite schist,
Jan 1, 1934