The Development of Metallurgical Practice for Poseidon Limited Nickel Ores
    
    - Organization:
 - The Australasian Institute of Mining and Metallurgy
 - Pages:
 - 12
 - File Size:
 - 211 KB
 - Publication Date:
 - Jan 1, 1973
 
Abstract
The initial development fl6tation  testwork on Mt. Windarra op was  completed on composited drill core  intersections at the.Australian Mineral  Development Laboratory. An exploratory winze provided  samples, from the 130 M. level of the  Mt. Windarra mine, for pilot plant and  bench development tests. A limited test programme was  initiated on the South Windarra drill  core composites. Detailed mineralogy has been  completed on selected samples from  both ore deposits.
Citation
APA: (1973) The Development of Metallurgical Practice for Poseidon Limited Nickel Ores
MLA: The Development of Metallurgical Practice for Poseidon Limited Nickel Ores. The Australasian Institute of Mining and Metallurgy, 1973.