Belt Conveying at the Ore Reduction Plant

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 4
- File Size:
- 744 KB
- Publication Date:
- Jan 1, 1942
Abstract
FOUR separate groups of conveyors are installed in the Morenci Reduction Works as follows: (1) Ore-handling conveyors from the primary crushing plant to the coarse ore bin, from the coarse-ore bin to the secondary crushing plant, and from the secondary crushing plant to the ore bin in the concentrator plant. (2) Conveyors in the mill section of the concentrator plant. (3) Conveyors handling concentrate from the filter plant to the bedding plant, and from this plant to the smelter. (4) Conveyors handling flux and custom ore in the smelter crushing plant and to the bin at the bedding plant.
Citation
APA:
(1942) Belt Conveying at the Ore Reduction PlantMLA: Belt Conveying at the Ore Reduction Plant. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1942.