Belt Conveying at the Ore Reduction Plant

The American Institute of Mining, Metallurgical, and Petroleum Engineers
AIME AIME
Organization:
The American Institute of Mining, Metallurgical, and Petroleum Engineers
Pages:
4
File Size:
744 KB
Publication Date:
Jan 1, 1942

Abstract

FOUR separate groups of conveyors are installed in the Morenci Reduction Works as follows: (1) Ore-handling conveyors from the primary crushing plant to the coarse ore bin, from the coarse-ore bin to the secondary crushing plant, and from the secondary crushing plant to the ore bin in the concentrator plant. (2) Conveyors in the mill section of the concentrator plant. (3) Conveyors handling concentrate from the filter plant to the bedding plant, and from this plant to the smelter. (4) Conveyors handling flux and custom ore in the smelter crushing plant and to the bin at the bedding plant.
Citation

APA: AIME AIME  (1942)  Belt Conveying at the Ore Reduction Plant

MLA: AIME AIME Belt Conveying at the Ore Reduction Plant. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1942.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account